Balance FS-550 1997 VS Merlin CRITICAL PATH 1998 specs comparison

Balance FS-550 1997 comparison online with competitors

Balance FS-550

General Infos
Model FS-550
Manufacturer Balance
Year of production 1997
Current price Check price Here ==>   
Color choice -Ball burnished and polish and olive fade
Sizes - 14 (inches)
- 16 (inches)
- 17.5 (inches)
- 19 (inches)
- 20.5 (inches)
Sizes - 14 (inches)
- 16 (inches)
- 17.5 (inches)
- 19 (inches)
- 20.5 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Tektro RBP-376AG Levers
Shimano Deore LX V-Brake Brakes
Hubs for disc brakes Rear: Shimano Deore XT
Front: Shimano Deore LX
Rims manufacturer 32-hole
Mavic 220
Spoke nipples typeBrass Nipples
Spoke wheel 2.0 (millimeters) Straight Gauge
Stainless Steel

Frame and Body Specs

Frame materials Butted
7005 Aluminum
Frame typeTIG-welded
Handlebar constructionBalance R.I.D.
Handlebar extenderOptional
Handlebar stem detailsBalance R.I.D.
Headset size1 1/8 (inches) Threadless Dia-Compe Aheadset

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG51
Bottom bracket shell widthNot Available
Bottom bracket typeShimano BB-UN52
Crankset parts and sizes 22/32/42 Teeth
Shimano Deore LX
Gear shift leversShimano Deore LX RapidFire SL
Rear gear set8-speed

Balance FS-550 Fork System Data

Derailleur (Front)Shimano Deore LX
Derailleur (Rear)Shimano Deore XT SGS
Fork material Triple-clamp Crown
Magnesium
Fork typeRock Shox Indy SL

Other Specs of Balance FS-550

Component group setsShimano Deore LX
Pedals detailsBalance Clipless
Rear shock absorber 3.25 (inches) Travel
Dyna-mount
Saddle seatBalance
Seat post extension 30.0 (millimeters) Diameter
Balance R.I.D.


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....