Bianchi CAMOS 8700 XC FS 2008 VS Merlin CRITICAL PATH 1998 specs comparison

Bianchi Camos 8700 XC FS
General InfosModel | Camos 8700 XC FS |
Manufacturer | Bianchi |
Year of production | 2008 |
Current price | Check price Here ==> |
Color choice | -Carbon and White |
Sizes | - 45cm (centimeters)- 48cm (centimeters)- 53cm (centimeters) |
Sizes | - 45cm (centimeters)- 48cm (centimeters)- 53cm (centimeters) |
Wheels And Breaking System
Bike front tire | 26 X 2.00 (inches) Michelin XCR Dry 2 Tubeless |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XT Hydraulic LeversShimano XT Disc Brakes |
Hubs for disc brakes | Rear: Mavic CrossTrail DiscFront: Mavic CrossTrail Disc |
Rims manufacturer | Mavic CrossTrail Disc |
Spoke nipples type | Not Available |
Spoke wheel | Mavic |
Frame and Body Specs
Frame materials | Bianchi Super-High Modulus Carbon |
Frame type | Monocoque |
Handlebar construction | FSA K-Force Carbon Flat OS |
Handlebar extender | Optional |
Handlebar stem details | FSA ST-OS-150LX |
Headset size | 1 1/8 (inches) FSA Orbit ZS |
Gearing Specifications
Bicycle chain | Shimano XTR |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano Hollowtech II |
Crankset parts and sizes | 22/32/44 TeethShimano XT |
Gear shift levers | Shimano XT |
Rear gear set | 11 - 32 Teeth9-speed |
Bianchi Camos 8700 XC FS Fork System Data
Derailleur (Front) | Shimano XT |
Derailleur (Rear) | Shimano XTR |
Fork material | Single |
Fork type | 100 (millimeters) TravelMarzocchi Marathon Corsa LT |
Other Specs of Bianchi Camos 8700 XC FS
Component group sets | Shimano XT |
Pedals details | Not Available |
Rear shock absorber | 80 (millimeters) TravelDT Swiss SSD 190 L LRCS |
Saddle seat | San Marco Caymano Bilanciata |
Seat post extension | 31.6 (millimeters) DiameterFSA K-Force Carbon |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice | -Brushed |
Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR LeversShimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-holeMavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-buttedWheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) SpindleShimano BB-M950 |
Crankset parts and sizes | 24/34/46 TeethShimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters)Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp CrownAluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) TravelRock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) DiameterSyncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Bianchi provided us with the latest version of its Camos 8700 XC FS bike manual
- Find All parts, tires and accessories of Bianchi Camos 8700 XC FS Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here