Brodie ZEALOT 2011 VS Merlin CRITICAL PATH 1998 specs comparison
Brodie Zealot
General InfosModel | Zealot |
Manufacturer | Brodie |
Year of production | 2011 |
Current price | Check price Here ==> |
Color choice |
-Light blue |
Sizes |
- S - M - L |
Sizes |
- S - M - L |
Wheels And Breaking System
Bike front tire | 26 X 2.35 Intense Edge |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano SLX |
Hubs for disc brakes | Shimano SLX Centerlock Disc |
Rims manufacturer | Rear: Sun SS Front: Sun EQ29 |
Spoke nipples type | Not Available |
Spoke wheel | Not Available |
Frame and Body Specs
Frame materials | 7005 Butted And Shaped FR |
Frame type | Not Available |
Handlebar construction | TruVative Hussefelt |
Handlebar extender | Optional |
Handlebar stem details | TruVativ XR |
Headset size | Not Available |
Gearing Specifications
Bicycle chain | Not Available |
Bottom bracket shell width | Not Available |
Bottom bracket type | Not Available |
Crankset parts and sizes | 22/36/BG Teeth Shimano SLX |
Gear shift levers | Shimano SLX |
Rear gear set | 11 - 34 Teeth |
Brodie Zealot Fork System Data
Derailleur (Front) | Shimano SLX |
Derailleur (Rear) | Shimano SLX |
Fork material | Not Available |
Fork type | 160 (millimeters) Travel Marzocchi 55-R |
Other Specs of Brodie Zealot
Component group sets | Shimano SLX |
Pedals details | Crank Bros. 50/50 Flat |
Rear shock absorber | RockShox Monarch 2.1 |
Saddle seat | WTB Pure V Race |
Seat post extension | 31.6 (millimeters) Diameter Truvativ XR |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Brodie provided us with the latest version of its Zealot bike manual
- Find All parts, tires and accessories of Brodie Zealot Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here