A PHP Error was encountered

Severity: Warning

Message: fopen(/opt/alt/php73/var/lib/php/session/ci_sessione08323b5954f78c4cb3b2c74f69a02d6192305a2): failed to open stream: Disk quota exceeded

Filename: drivers/Session_files_driver.php

Line Number: 176

Backtrace:

File: /home7/manyoff1/yobicycle_public_html/index.php
Line: 315
Function: require_once

A PHP Error was encountered

Severity: Warning

Message: session_start(): Failed to read session data: user (path: /opt/alt/php73/var/lib/php/session)

Filename: Session/Session.php

Line Number: 143

Backtrace:

File: /home7/manyoff1/yobicycle_public_html/index.php
Line: 315
Function: require_once

Cannondale MOTO 2 2009 VS Merlin CRITICAL PATH 1998 specs and price comparison online

Cannondale MOTO 2 2009 VS Merlin CRITICAL PATH 1998 specs comparison

Cannondale Moto 2 2009 comparison online with competitors

Cannondale Moto 2

General Infos
Model Moto 2
Manufacturer Cannondale
Year of production 2009
Current price Check price Here ==>   
Color choice -Charcoal Gray
Sizes - Small
- Medium
- Large
- Extra large
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire26 X 2.40 (inches) Continental Mountain King SuperSonic
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Elixir CR Levers
Avid Elixir CR With 203 Or 185 (millimeters) Rotor Front and Avid Elixir CR With 185 (millimeters) Rotor Rear Brakes
Hubs for disc brakes Rear: DT Swiss E2200 12 (millimeters) Thru-axle
Front: DT Swiss E2200 20 (millimeters) Thru-axle
Rims manufacturerDT Swiss E2200
Spoke nipples typeNot Available
Spoke wheelDT Swiss

Frame and Body Specs

Frame materialsHigh Modulus Carbon Fiber and aluminum
Frame typeTIG-welded and Monocoque
Handlebar constructionFSA XC-190AOS Riser
Handlebar extenderOptional
Handlebar stem detailsCannondale XC3
Headset size1 1/2 (inches) Moto Integrated

Gearing Specifications

Bicycle chainShimano Nine Speed
Bottom bracket shell widthNot Available
Bottom bracket typeShimano Hollowtech II
Crankset parts and sizes 22/32/44 Teeth
Shimano Deore XT
Gear shift leversSRAM X.9 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Cannondale Moto 2 Fork System Data

Derailleur (Front)Shimano Deore LX
Derailleur (Rear)SRAM X.9
Fork material Single Crown
Aluminum and magnesium
Fork type 100 - 160 (millimeters) Adjustable Travel
Fox 36 Talas R

Other Specs of Cannondale Moto 2

Component group setsSRAM X.9/mix
Pedals detailsCrank Brothers Smarty
Rear shock absorber 160 (millimeters) Travel
Fox DHX 4.0 Air
Saddle seatFi'zi:k Gobi XM With Mg Rails
Seat post extension 27.2 (millimeters) Diameter
Thomson Elite


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....