Cannondale MOTO CARBON 2 2010 VS Merlin CRITICAL PATH 1998 specs comparison

Cannondale Moto Carbon 2 2010 comparison online with competitors

Cannondale Moto Carbon 2

General Infos
Model Moto Carbon 2
Manufacturer Cannondale
Year of production 2010
Current price Check price Here ==>   
Color choice -Berserker Green
Sizes - S
- M
- L
- X
Sizes - S
- M
- L
- X

Wheels And Breaking System

Bike front tire26 X 2.35 Kenda Nevegal
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Magura Louise BAT Levers
Magura Louise BAT Front and Magura Louise BAT With 180 (millimeters) Rotor Rear Brakes
Hubs for disc brakes Rear: DT Swiss 340 Thru-12
Front: DT Swiss 340 Thru-20
Rims manufacturer 32-hole
DT Swiss E540
Spoke nipples typeNot Available
Spoke wheelDT Swiss Competition

Frame and Body Specs

Frame materialsMoto Carbon
Frame typeCarbon
Handlebar constructionFSA XC-190 Riser
Handlebar extenderOptional
Handlebar stem detailsCannondale XC3
Headset size1.5 (inches) Integrated Tange Custom

Gearing Specifications

Bicycle chainKMC X9 CP 9-speed
Bottom bracket shell widthNot Available
Bottom bracket typeFSA BB30
Crankset parts and sizes 44/32/22 Teeth
FSA Afterburner With Carbon Spider
Gear shift leversSRAM X-9 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Cannondale Moto Carbon 2 Fork System Data

Derailleur (Front)SRAM X-7
Derailleur (Rear)SRAM X-9
Fork materialSingle
Fork type 160 (millimeters) Travel
Fox 36 Talas R

Other Specs of Cannondale Moto Carbon 2

Component group setsMountain Mix
Pedals detailsCrank Brothers Candy
Rear shock absorber 160 (millimeters) Travel
Fox RP23
Saddle seatFizik Gobi XM
Seat post extension 31.6 (millimeters) Diameter
Thompson Elite


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....