Cannondale PROPHET 1 2007 VS Merlin CRITICAL PATH 1998 specs comparison

Cannondale Prophet 1 2007 comparison online with competitors

Cannondale Prophet 1

General Infos
Model Prophet 1
Manufacturer Cannondale
Year of production 2007
Current price Check price Here ==>   
Color choice - Teak Brown
-Galvanized
Sizes - Small
- medium
- large
- xlarge
- petite
Sizes - Small
- medium
- large
- xlarge
- petite

Wheels And Breaking System

Bike front tire26 X 2.35 (inches) Maxxis Ignitor UST
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes El Camino Levers
Hayes El Camino Brakes
Hubs for disc brakesMavic CrossMax SLR UST
Rims manufacturerMavic CrossMax SLR UST
Spoke nipples typeNot Available
Spoke wheelMavic

Frame and Body Specs

Frame materialsAluminum
Frame typeTIG-welded
Handlebar constructionFSA Carbon K-Force
Handlebar extenderNot Available
Handlebar stem detailsCannondale XC3 HeadShok
Headset sizeCannondale HeadShok Si

Gearing Specifications

Bicycle chainSRAM PG-991
Bottom bracket shell widthNot Available
Bottom bracket typeFSA K-Force MegaExo
Crankset parts and sizes 22/32/44 Teeth
FSA K-Force MegaExo
Gear shift leversSRAM X.0 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Cannondale Prophet 1 Fork System Data

Derailleur (Front)Shimano XT
Derailleur (Rear)SRAM X.0
Fork material Single Crown
Carbon
Fork type 140 (millimeters) Travel
Cannondale Lefty Max Carbon SPV + Ti

Other Specs of Cannondale Prophet 1

Component group setsSRAM X.0/mix
Pedals detailsShimano PD-M520
Rear shock absorber 140 (millimeters) Travel
Manitou Swinger 3-Way Air
Saddle seatSDG Bel Air SL
Seat post extensionSDG I-Beam Carbon


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....