Cannondale PROPHET 3 2008 VS Merlin CRITICAL PATH 1998 specs comparison
Cannondale Prophet 3
General InfosModel | Prophet 3 |
Manufacturer | Cannondale |
Year of production | 2008 |
Current price | Check price Here ==> |
Color choice |
-Raw HI-Bright |
Sizes |
- Small - Medium - Large - Extra large |
Sizes |
- Small - Medium - Large - Extra large |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) Maxxis Ridgeline |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Juicy 3 Hydraulic Disc Levers Avid Juicy 3 Hydraulic With 185 (millimeters) Rotor Front and Avid Juicy 3 Hydraulic With 160 (millimeters) Rotor Rear Brakes |
Hubs for disc brakes | Shimano M525 Disc |
Rims manufacturer | 32-hole WTB Speed Disc XC |
Spoke nipples type | Not Available |
Spoke wheel | DT Swiss Champion Stainless Steel |
Frame and Body Specs
Frame materials | Aluminum |
Frame type | TIG-welded |
Handlebar construction | 31.8 (millimeters) FSA XC-281AOS |
Handlebar extender | Not Available |
Handlebar stem details | Cannondale XC3 |
Headset size | 1 1/8 (inches) Threadless Cannondale Converter |
Gearing Specifications
Bicycle chain | Shimano 9 Speed |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | Shimano Hollowtech II |
Crankset parts and sizes | 22/32/44 Teeth Shimano FC-M542 |
Gear shift levers | SRAM X-7 Trigger |
Rear gear set | 11 - 34 Teeth 9-speed |
Cannondale Prophet 3 Fork System Data
Derailleur (Front) | Shimano LX |
Derailleur (Rear) | SRAM X.9 |
Fork material | Single Crown Aluminum and magnesium |
Fork type | 140 (millimeters) Travel Fox 32 Vanilla R |
Other Specs of Cannondale Prophet 3
Component group sets | Mountain Mix |
Pedals details | Wellgo Clipless |
Rear shock absorber | 140 (millimeters) Travel Fox Float R |
Saddle seat | Cannondale X-Country |
Seat post extension | 27.2 (millimeters) Diameter Cannondale Alloy |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Cannondale provided us with the latest version of its Prophet 3 bike manual
- Find All parts, tires and accessories of Cannondale Prophet 3 Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here