Cannondale RUSH TEAM REPLICA 2006 VS Merlin CRITICAL PATH 1998 specs comparison

Cannondale Rush Team Replica 2006 comparison online with competitors

Cannondale Rush Team Replica

General Infos
Model Rush Team Replica
Manufacturer Cannondale
Year of production 2006
Current price Check price Here ==>   
Color choice -Siemens Team Replica
Sizes - Petite
- small
- medium
- large
- xlarge
Sizes - Petite
- small
- medium
- large
- xlarge

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) Maxxis CROSSMARK XC UST
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Magura Marta SL Levers
Magura Marta SL Brakes
Hubs for disc brakesMavic CrossMax SL UST
Rims manufacturerMavic CrossMax SL UST
Spoke nipples typeNot Available
Spoke wheelMavic

Frame and Body Specs

Frame materialsRush Si
Frame typeNot Available
Handlebar constructionFSA Carbon K-Force
Handlebar extenderOptional
Handlebar stem detailsCannondale XC3 HeadShok
Headset sizeCannondale HeadShok Si

Gearing Specifications

Bicycle chainSRAM PG-991
Bottom bracket shell widthNot Available
Bottom bracket typeCannondale Hollowgram Si
Crankset parts and sizes 22/32/44 Teeth
Cannondale Si Hollowgram
Gear shift leversSRAM X-0 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Cannondale Rush Team Replica Fork System Data

Derailleur (Front)Shimano XTR
Derailleur (Rear)SRAM X-0
Fork materialAluminum and carbon Fiber
Fork type 110 (millimeters)
Lefty Speed Carbon FOX TerraLogic TT

Other Specs of Cannondale Rush Team Replica

Component group setsMountain Mix
Pedals detailsCrank Brothers Egg Beater
Rear shock absorber 110 (millimeters) Travel
FOX Float RP3
Saddle seatFi'zi:k Aliante Team Replica Ti
Seat post extensionFSA Carbon K-Force Lite


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....