Cannondale RZ ONE FORTY 3Z 2010 VS Merlin CRITICAL PATH 1998 specs comparison
Cannondale RZ One Forty 3Z
General InfosModel | RZ One Forty 3Z |
Manufacturer | Cannondale |
Year of production | 2010 |
Current price | Check price Here ==> |
Color choice |
-Galvenized |
Sizes |
- S - M - L - X |
Sizes |
- S - M - L - X |
Wheels And Breaking System
Bike front tire | 26 X 2.25 (inches) Schwalbe Nobby Nic |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Elixer R Levers Avid Elixer R With 180 (millimeters) Rotor Brakes |
Hubs for disc brakes | Rear: Sun Dirty Flea Front: Formula DC91 Thru-20 |
Rims manufacturer | 32-hole Sun EQ27 |
Spoke nipples type | Not Available |
Spoke wheel | DT Swiss Competition |
Frame and Body Specs
Frame materials | RZ One Forty |
Frame type | TIG-welded |
Handlebar construction | TruVativ Hussefelt |
Handlebar extender | Optional |
Handlebar stem details | Truvativ AKA 1.5 |
Headset size | 1.5 (inches) Integrated Tange Custom |
Gearing Specifications
Bicycle chain | KMC X9 CP 9-speed |
Bottom bracket shell width | Not Available |
Bottom bracket type | TruVativ Ha (millimeters)erschmidt |
Crankset parts and sizes | 38/24 Teeth Truvativ Ha (millimeters)erschmidt AM |
Gear shift levers | SRAM X-9 Trigger |
Rear gear set | 11 - 34 Teeth 9-speed |
Cannondale RZ One Forty 3Z Fork System Data
Derailleur (Front) | Internal Transmission Crank TruVativ Ha (millimeters)erschmidt |
Derailleur (Rear) | SRAM X-9 |
Fork material | Single Crown Aluminum |
Fork type | 140 (millimeters) Travel RockShox Revelation Team Air U-Turn |
Other Specs of Cannondale RZ One Forty 3Z
Component group sets | Mountain Mix |
Pedals details | Crank Brothers Candy |
Rear shock absorber | 140 (millimeters) Travel RockShox Monarch 4.2 |
Saddle seat | SDG Formula MTR |
Seat post extension | 31.6 (millimeters) Diameter Cannondale C3 |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Cannondale provided us with the latest version of its RZ One Forty 3Z bike manual
- Find All parts, tires and accessories of Cannondale RZ One Forty 3Z Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here