Cannondale SUPER V 4000 1997 VS Merlin CRITICAL PATH 1998 specs comparison

Cannondale Super V 4000 1997 comparison online with competitors

Cannondale Super V 4000

General Infos
Model Super V 4000
Manufacturer Cannondale
Year of production 1997
Current price Check price Here ==>   
Color choice -Red
Sizes - Small
- Medium
- Large
- Extra large
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) IRC Mythos XC Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type CODA 1000 Levers
CODA 1000/CODA Disc Front Brakes
Hubs for disc brakes Rear: CODA 900
Front: CODA Moto
Rims manufacturer 32-hole and 36-hole
Mavic 220
Spoke nipples typeBrass Nipples
Spoke wheel 1.8 (millimeters) Straight Gauge
DT Stainless Steel

Frame and Body Specs

Frame materials6061 T6 Aluminum
Frame typeTIG-welded
Handlebar constructionCODA Competition
Handlebar extenderCODA Babu 2
Handlebar stem detailsCODA Suspension Specific
Headset size1 1/8 (inches) Threadless Dia-Compe Aheadset

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Sachs SC-45
Bottom bracket shell width68 (millimeters) English
Bottom bracket typeCODA 900M
Crankset parts and sizes 22/32/42 Teeth
CODA 900M
Gear shift leversSachs Power Grip Extreme
Rear gear set 11 - 30 Teeth
8-speed

Cannondale Super V 4000 Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR Top-swing
Derailleur (Rear)Shimano XTR SGS
Fork material Double Triple-clamp Crown
Aluminum
Fork typeCannondale Headshock Moto 80

Other Specs of Cannondale Super V 4000

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 4.0 (inches) Travel
Fox Alps-5R
Saddle seat Titanium Rails
CODA 1000
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....