Cannondale SUPER V RAVEN FREERIDE 2000 1999 VS Merlin CRITICAL PATH 1998 specs comparison
Cannondale Super V Raven Freeride 2000
General InfosModel | Super V Raven Freeride 2000 |
Manufacturer | Cannondale |
Year of production | 1999 |
Current price | Check price Here ==> |
Color choice |
-Blue-Tinted Clearcoat |
Sizes |
- Large - medium |
Sizes |
- Large - medium |
Wheels And Breaking System
Bike front tire | 26 X 2.25 (inches) IRC Free Ride K |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | CODA Compact Disc Levers CODA Compact Disc Hydraulic Brakes |
Hubs for disc brakes | CODA Expert Disc |
Rims manufacturer | 32-hole Mavic X223 |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 1.8 (millimeters) Double-butted DT Stainless Steel |
Frame and Body Specs
Frame materials | Aluminum and carbon Fiber Composite |
Frame type | Cast Aluminum and laminated Carbon Fiber |
Handlebar construction | Azonic Riser |
Handlebar extender | Optional |
Handlebar stem details | CODA Front Loader Aluminum |
Headset size | 1 1/8 (inches) Threadless Cane Creek C2 |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-HG72 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 110 (millimeters) Spindle Shimano BB-UN52 |
Crankset parts and sizes | 22/32/44 Teeth CODA Tarantula Expert |
Gear shift levers | Grip Shift Plasma |
Rear gear set | 11 - 34 Teeth 9-speed |
Cannondale Super V Raven Freeride 2000 Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 31.8 (millimeters) Shimano Deore XT Top-swing |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Double Triple-clamp Crown Aluminum |
Fork type | 4.0 (inches) Travel HeadShok Moto FR |
Other Specs of Cannondale Super V Raven Freeride 2000
Component group sets | Mountain Mix |
Pedals details | CODA 900 Clipless |
Rear shock absorber | 4.7 (inches) Travel Fox Air Vanilla R |
Saddle seat | Titanium Rails CODA Competition |
Seat post extension | 27.2 (millimeters) Diameter Kalloy SP-248 |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Cannondale provided us with the latest version of its Super V Raven Freeride 2000 bike manual
- Find All parts, tires and accessories of Cannondale Super V Raven Freeride 2000 Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here