Commencal META 5.5 NUMERO 1 2007 VS Merlin CRITICAL PATH 1998 specs comparison

Commencal Meta 5.5 numero 1 2007 comparison online with competitors

Commencal Meta 5.5 numero 1

General Infos
Model Meta 5.5 numero 1
Manufacturer Commencal
Year of production 2007
Current price Check price Here ==>   
Color choice -Anthracite Silver
Sizes - 40cm (centimeters)
- 45cm (centimeters)
- 50cm (centimeters)
- 53cm (centimeters)
Sizes - 40cm (centimeters)
- 45cm (centimeters)
- 50cm (centimeters)
- 53cm (centimeters)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) Maxxis High Roller
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Formula Oro Levers
Formula Oro 18k With 180 (millimeters) Rotor Front and Formula Oro 18k With 160 (millimeters) Rotor Rear Brakes
Hubs for disc brakesCo (millimeters)encal Disc Light
Rims manufacturerSun SOS
Spoke nipples typeNot Available
Spoke wheelNot Available

Frame and Body Specs

Frame materialsCo (millimeters)encal Meta
Frame typeTIG-welded
Handlebar constructionCo (millimeters)encal Medium 6061
Handlebar extenderOptional
Handlebar stem detailsRace Face Evolve XC
Headset sizeNot Available

Gearing Specifications

Bicycle chainNot Available
Bottom bracket shell widthNot Available
Bottom bracket typeNot Available
Crankset parts and sizesTruvativ Firex GXP
Gear shift leversSRAM X.7
Rear gear set9-speed

Commencal Meta 5.5 numero 1 Fork System Data

Derailleur (Front)Shimano LX
Derailleur (Rear)SRAM X.9
Fork material Single Crown
Aluminum and steel and magnesium
Fork type 140 (millimeters) Travel
Fox 32 Float 140R

Other Specs of Commencal Meta 5.5 numero 1

Component group setsMountain Mix
Pedals detailsOptional
Rear shock absorberFox Float R
Saddle seatSDG Bel Air
Seat post extensionRace Face Evolve XC


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....