Commencal META 6 2010 VS Merlin CRITICAL PATH 1998 specs comparison

Commencal Meta 6 2010 comparison online with competitors

Commencal Meta 6

General Infos
Model Meta 6
Manufacturer Commencal
Year of production 2010
Current price Check price Here ==>   
Color choice -Shiny White
Sizes - Small
- medium
- large
- x-large
Sizes - Small
- medium
- large
- x-large

Wheels And Breaking System

Bike front tire26 X 2.35 (inches) Maxxis High Roller
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Formula RX Levers
Formula RX Disc With 180 (millimeters) Rotor Brakes
Hubs for disc brakes Rear: Ç 12 (millimeters) Sealed Bearings
Front: Ç Disc 20 (millimeters) Sealed Bearings
Rims manufacturerMavic EN-321
Spoke nipples typeNot Available
Spoke wheelStainless

Frame and Body Specs

Frame materialsAluminum
Frame typeTIG-welded
Handlebar constructionÇ 1.5 6061 DB Oversize
Handlebar extenderOptional
Handlebar stem detailsRace Face Evolve AM 31.8
Headset size1 1/8 (inches) Tange LAV 85

Gearing Specifications

Bicycle chainSRAM
Bottom bracket shell widthNot Available
Bottom bracket typeRaceFace X-Type
Crankset parts and sizes 24/36+bash Teeth
RaceFace Evolve
Gear shift leversSRAM X.7 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Commencal Meta 6 Fork System Data

Derailleur (Front)Shimano SLX
Derailleur (Rear)SRAM X.9
Fork material Single Crown
Magnesium and aluminum
Fork type 160 (millimeters) Travel
Fox 36 Talas R

Other Specs of Commencal Meta 6

Component group setsMountain Mix
Pedals detailsNot Available
Rear shock absorber 6 (inches) Travel
Fox Float RP2 VX
Saddle seatSDG Formula FX RL
Seat post extensionCrank Brothers Joplin


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....