Conejo RBX5 (13) 1998 VS Merlin CRITICAL PATH 1998 specs comparison
Conejo RBx5 (13)
General InfosModel | RBx5 (13) |
Manufacturer | Conejo |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice | - dark green- red- yellow-Black |
Sizes | - 16 (inches)- 18.5 (inches)- 21 (inches) |
Sizes | - 16 (inches)- 18.5 (inches)- 21 (inches) |
Wheels And Breaking System
Bike front tire | Rear: 26 X 2.00 (inches) Geax Hook 200Front: 26 X 2.15 (inches) Geax Warp 215 |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Dia-Compe PC-7 LeversDia-Compe 985C Brakes |
Hubs for disc brakes | Shimano Deore LX |
Rims manufacturer | 32-holeSun Rims CR18 |
Spoke nipples type | Brass Nipples |
Spoke wheel | 2.0 (millimeters) Straight GaugeStainless Steel |
Frame and Body Specs
Frame materials | 6061 T6 Aluminum |
Frame type | TIG-welded |
Handlebar construction | Tranz-X |
Handlebar extender | Optional |
Handlebar stem details | Kalloy Uno |
Headset size | 1 1/8 (inches) Threadless Aheadset Kontak DL |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano BB-UN52 |
Crankset parts and sizes | 22/32/42 TeethShimano Deore LX |
Gear shift levers | Grip Shift SRT-800 X-Ray |
Rear gear set | 11 - 28 Teeth8-speed |
Conejo RBx5 (13) Fork System Data
Derailleur (Front) | Shimano Deore LX Top-swing |
Derailleur (Rear) | Shimano Deore LX SGS |
Fork material | Triple-clamp CrownAluminum |
Fork type | White Brothers SC70 |
Other Specs of Conejo RBx5 (13)
Component group sets | Shimano Deore LX |
Pedals details | Odyssey Svelte Pro |
Rear shock absorber | 5.0 (inches) TravelFox Alps-5R |
Saddle seat | Bontrager With Chromoly Rails |
Seat post extension | Kalloy Uno |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice | -Brushed |
Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR LeversShimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-holeMavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-buttedWheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) SpindleShimano BB-M950 |
Crankset parts and sizes | 24/34/46 TeethShimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters)Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp CrownAluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) TravelRock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) DiameterSyncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Conejo provided us with the latest version of its RBx5 (13) bike manual
- Find All parts, tires and accessories of Conejo RBx5 (13) Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here