Crestone Peak SAS EXPERT 1995 VS Merlin CRITICAL PATH 1998 specs comparison
Crestone Peak SAS Expert
General InfosModel | SAS Expert |
Manufacturer | Crestone Peak |
Year of production | 1995 |
Current price | Check price Here ==> |
Color choice | -Dark blue |
Sizes | - 16 (inches)- 18 (inches)- 20 (inches) |
Sizes | - 16 (inches)- 18 (inches)- 20 (inches) |
Wheels And Breaking System
Bike front tire | Rear: 26 X 2.10 (inches) Kenda K-816Front: 26 X 2.10 (inches) Kenda K-837 |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Tektro 364AP LeversTektro 863A Brakes |
Hubs for disc brakes | Shimano Alivio |
Rims manufacturer | Alex VP-20 |
Spoke nipples type | Brass Nipples |
Spoke wheel | 2.0 (millimeters) Straight GaugeStainless Steel |
Frame and Body Specs
Frame materials | 4130 chromoly c |
Frame type | TIG-welded Steel |
Handlebar construction | ST-110 |
Handlebar extender | Optional |
Handlebar stem details | LCS-M03NT |
Headset size | 1 1/8 (inches) YST 530 |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-IG30 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Not Available |
Crankset parts and sizes | 22/32/42 TeethShimano Alivio HyperDrive-C |
Gear shift levers | Grip Shift SRT-400 |
Rear gear set | 11 - 28 Teeth7-speed |
Crestone Peak SAS Expert Fork System Data
Derailleur (Front) | Bottom-pullShimano Alivio |
Derailleur (Rear) | Shimano Alivio GS |
Fork material | ButtedChromoly |
Fork type | SAS |
Other Specs of Crestone Peak SAS Expert
Component group sets | Shimano Alivio |
Pedals details | Wellgo LU-898 |
Rear shock absorber | Not Available |
Saddle seat | Velo Jet |
Seat post extension | 26.6 (millimeters) DiameterKalloy SP-246 |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice | -Brushed |
Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR LeversShimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-holeMavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-buttedWheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) SpindleShimano BB-M950 |
Crankset parts and sizes | 24/34/46 TeethShimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters)Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp CrownAluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) TravelRock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) DiameterSyncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Crestone Peak provided us with the latest version of its SAS Expert bike manual
- Find All parts, tires and accessories of Crestone Peak SAS Expert Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here