Dean SPUTNIK CTI 2002 VS Merlin CRITICAL PATH 1998 specs comparison
![Dean Sputnik CTi 2002 comparison online with competitors](https://yobicycle.com/images/models/Dean-Sputnik-CTi-2002-specs.jpg)
Dean Sputnik CTi
General InfosModel | Sputnik CTi |
Manufacturer | Dean |
Year of production | 2002 |
Current price | Check price Here ==> |
Color choice |
-Titanium and Carbon |
Sizes |
- Large - small/medium - xlarge |
Sizes |
- Large - small/medium - xlarge |
Wheels And Breaking System
Bike front tire | Optional |
Bike rear tire | Not Available |
Bike wheel size | Optional Wheels |
Brakeset type | Shimano XTR RapidFire SL Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Bontrager ATB Pro |
Rims manufacturer | 24-hole and 28-hole Bontrager Race Lite Tubeless |
Spoke nipples type | Aluminum Nipples |
Spoke wheel | 14/17ga. Double-butted Stainless Steel |
Frame and Body Specs
Frame materials | Carbon Fiber Composite and 3Al and 2.5V Titanium |
Frame type | Fiber-fusion and TIG-welded |
Handlebar construction | DEAN Titanium |
Handlebar extender | Optional |
Handlebar stem details | DEAN Forged Aluminum |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-7700 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 116 (millimeters) Spindle Shimano BB-M952 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | Optional Of Gearing 9-speed |
Dean Sputnik CTi Fork System Data
Derailleur (Front) | Top-pull and clamp-on 31.8 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Single Triple-clamp Crown Aluminum and carbon Fiber Composite |
Fork type | Rock Shox Sid Carbon |
Other Specs of Dean Sputnik CTi
Component group sets | Shimano XTR |
Pedals details | Not Available |
Rear shock absorber | 1.15 (inches) Travel Stratos Pro |
Saddle seat | Fi'zi:k: Nisene Ti |
Seat post extension | 27.2 (millimeters) Diameter DEAN Titanium Post |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Dean provided us with the latest version of its Sputnik CTi bike manual
- Find All parts, tires and accessories of Dean Sputnik CTi Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here