Diamondback MISSION 2 2010 VS Merlin CRITICAL PATH 1998 specs comparison

Diamondback Mission 2 2010 comparison online with competitors

Diamondback Mission 2

General Infos
Model Mission 2
Manufacturer Diamondback
Year of production 2010
Current price Check price Here ==>   
Color choice -Matte Dark Grey
Sizes - Small (15.5) (inches)
- medium (17) (inches)
- large (inches)
- xlarge (inches)
Sizes - Small (15.5) (inches)
- medium (17) (inches)
- large (inches)
- xlarge (inches)

Wheels And Breaking System

Bike front tire Rear: 26 X 2.30 (inches) WTB Stout
Front: 26 X 2.50 (inches) WTB Prowler MX
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Stroker Trail Hydraulic Levers
Hayes Stroker Trail With V8 Rotor Front and Hayes Stroker Trail With V7 Rotor Rear Brakes
Hubs for disc brakes Rear: Alloy Disc
Front: Neau Naim Alloy Disc 15 (millimeters)
Rims manufacturer 32-hole
Sun Equalizer
Spoke nipples typeNot Available
Spoke wheel 14ga.
Stainless

Frame and Body Specs

Frame materials6061-T6 Aluminum With Hydroformed TT & Butted DT
Frame typeTIG-welded
Handlebar constructionEaston EA50 Midrise
Handlebar extenderOptional
Handlebar stem detailsEaston EA50 31.8
Headset size1 1/2 (inches) To 1 1/8 (inches) Tapered FSA No. 55

Gearing Specifications

Bicycle chainNot Available
Bottom bracket shell widthNot Available
Bottom bracket typeTruVativ GXP
Crankset parts and sizes 22/32/44 Teeth
Truvativ Firex GXP
Gear shift leversSRAM X.7 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Diamondback Mission 2 Fork System Data

Derailleur (Front) Top Swing
Shimano Deore
Derailleur (Rear)SRAM X.9
Fork material Single Crown
Aluminum and magnesium
Fork type 150 (millimeters) Travel
Fox Float 32 R With 15 (millimeters) QR

Other Specs of Diamondback Mission 2

Component group setsMountain Mix
Pedals detailsDB Sound Alloy
Rear shock absorber 6 (inches) Travel
Fox Float RP23 XV
Saddle seatWTB Lazer V Comp
Seat post extension 30.9 (millimeters) Diameter
Easton EA50 Two-bolt


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....