Diamondback MISSION 4 2011 VS Merlin CRITICAL PATH 1998 specs comparison
![Diamondback MISSION 4 2011 comparison online with competitors](https://yobicycle.com/images/models/Diamondback-MISSION-4-2011-specs.jpg)
Diamondback MISSION 4
General InfosModel | MISSION 4 |
Manufacturer | Diamondback |
Year of production | 2011 |
Current price | Check price Here ==> |
Color choice |
-Anodized green |
Sizes |
- SM (15.5) (inches) - MD (17) (inches) - LG (inches) - XL (inches) |
Sizes |
- SM (15.5) (inches) - MD (17) (inches) - LG (inches) - XL (inches) |
Wheels And Breaking System
Bike front tire | Rear: 26 X 2.3 (inches) WTB Stout Front: 26 X 2.5 (inches) WTB Prowler MX |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid XO Levers Avid X0 Brakes |
Hubs for disc brakes | Mavic Crossmax ST |
Rims manufacturer | 24-hole Mavic Crossmax ST |
Spoke nipples type | Not Available |
Spoke wheel | Mavic CrossMax ST |
Frame and Body Specs
Frame materials | 6061-T6 Aluminum |
Frame type | Aluminum |
Handlebar construction | EC-70 Carbon HiRise |
Handlebar extender | Optional |
Handlebar stem details | Easton EA90 |
Headset size | 1 1/8 (inches) FSA No. 55 |
Gearing Specifications
Bicycle chain | SRAM PC-1031 |
Bottom bracket shell width | Not Available |
Bottom bracket type | TruVativ Ha (millimeters)erschmidt |
Crankset parts and sizes | 22/36t Teeth Truvativ Ha (millimeters)erschmidt AM |
Gear shift levers | Sram X.0 |
Rear gear set | 11 - 32 Teeth 10-speed |
Diamondback MISSION 4 Fork System Data
Derailleur (Front) | Not Available |
Derailleur (Rear) | SRAM X.0 |
Fork material | Aluminum |
Fork type | 100 (millimeters) Travel Fox 36 Talas-RC2 With FIT Damper |
Other Specs of Diamondback MISSION 4
Component group sets | Mountain Mix |
Pedals details | DB Sound Alloy With Replaceable Pins |
Rear shock absorber | Fox Float RP23 XV |
Saddle seat | WTB Laser V Comp |
Seat post extension | 30.9 (millimeters) Diameter Easton EC90 Two Bolt |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Diamondback provided us with the latest version of its MISSION 4 bike manual
- Find All parts, tires and accessories of Diamondback MISSION 4 Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here