Diamondback SORTIE 1 2011 VS Merlin CRITICAL PATH 1998 specs comparison
Diamondback SORTIE 1
General InfosModel | SORTIE 1 |
Manufacturer | Diamondback |
Year of production | 2011 |
Current price | Check price Here ==> |
Color choice |
-White |
Sizes |
- SM (15.5) (inches) - MD (17) (inches) - LG (inches) - XL (inches) |
Sizes |
- SM (15.5) (inches) - MD (17) (inches) - LG (inches) - XL (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.1 (inches) WTB Wolverine |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano M445 Levers Shimano M445 Brakes |
Hubs for disc brakes | SL-6 Alloy |
Rims manufacturer | 32-hole SL-6 Doublewall Disc |
Spoke nipples type | Not Available |
Spoke wheel | 14ga. Stainless Steel Stainless |
Frame and Body Specs
Frame materials | 6061-T6 Aluminum |
Frame type | Aluminum |
Handlebar construction | DB Lazer Series |
Handlebar extender | Optional |
Handlebar stem details | DB AL6061 Ahead 7 |
Headset size | 1 1/8 (inches) Zero Stack |
Gearing Specifications
Bicycle chain | KMC Z99 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano BB ES25 Octalink |
Crankset parts and sizes | 24/32/44t Teeth Shimano Alivio |
Gear shift levers | Shimano Alivio Rapid Fire |
Rear gear set | 11 - 34 Teeth 9-speed |
Diamondback SORTIE 1 Fork System Data
Derailleur (Front) | 34.9 (millimeters) Top Swing Dual Pull Shimano Alivio |
Derailleur (Rear) | Shimano Alivio |
Fork material | Not Available |
Fork type | 120 (millimeters) Travel RockShox Tora 289 |
Other Specs of Diamondback SORTIE 1
Component group sets | Shimano Mix |
Pedals details | DB Toe Clip Compatible Alloy |
Rear shock absorber | Rock Shox Ario 2.1 |
Saddle seat | WTB Vigo Comp |
Seat post extension | 31.6 (millimeters) Diameter Diamondback Lazer Series Micro Adjust |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Diamondback provided us with the latest version of its SORTIE 1 bike manual
- Find All parts, tires and accessories of Diamondback SORTIE 1 Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here