Felt VIRTUE 1 2008 VS Merlin CRITICAL PATH 1998 specs comparison

Felt Virtue 1 2008 comparison online with competitors

Felt Virtue 1

General Infos
Model Virtue 1
Manufacturer Felt
Year of production 2008
Current price Check price Here ==>   
Color choice -Ghost White
Sizes - (S)15.5 (inches)
- (M) 17.5 (inches)
- (L) 19.5 (inches)
- 21.5 (inches)
Sizes - (S)15.5 (inches)
- (M) 17.5 (inches)
- (L) 19.5 (inches)
- 21.5 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) Maxxis Ignitor
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XT Hydraulic Servo Wave Levers
Shimano XT Disc With 180 (millimeters) Rotor Front and Shimano XT Disc With 160 (millimeters) Rotor Rear Brakes
Hubs for disc brakesShimano XT Centerlock Disc
Rims manufacturer 32-hole
Shimano XT Centerlock Disc
Spoke nipples typeNot Available
Spoke wheel Straight Pull
Shimano

Frame and Body Specs

Frame materials Carbon Sub-Frame
With Hydroformed TT
7005 Double Butted Aluminum
Frame typeTIG-welded
Handlebar constructionButted Aluminum Riser
Handlebar extenderOptional
Handlebar stem detailsAluminum Forged
Headset size1 1/8 (inches) Integrated

Gearing Specifications

Bicycle chainShimano HG-73
Bottom bracket shell widthNot Available
Bottom bracket typeShimano Hollowtech II
Crankset parts and sizes 22/32/44 Teeth
Shimano XT Hollowtech 2
Gear shift leversShimano XT Rapid Fire
Rear gear set 11 - 32 Teeth
9-speed

Felt Virtue 1 Fork System Data

Derailleur (Front)Shimano XT
Derailleur (Rear)Shimano XT Shadow
Fork material Single Crown
Aluminum and magnesium
Fork type 100 - 130 (millimeters) Adjustable Travel
RockShox Revelation 409 U-Turn Air

Other Specs of Felt Virtue 1

Component group setsShimano XT
Pedals detailsNot Available
Rear shock absorber 130 (millimeters) Travel
Fox Float RP23
Saddle seatFELT Facade Race
Seat post extension 27.2 (millimeters) Diameter
Alloy Micro Adjust 2-bolt


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....