Felt VIRTUE TEAM 2011 VS Merlin CRITICAL PATH 1998 specs comparison
Felt VIRTUE TEAM
General InfosModel | VIRTUE TEAM |
Manufacturer | Felt |
Year of production | 2011 |
Current price | Check price Here ==> |
Color choice |
-Matte carbon |
Sizes |
- S (15.5) - M (17.5) - L - XL |
Sizes |
- S (15.5) - M (17.5) - L - XL |
Wheels And Breaking System
Bike front tire | 26 X 2.4 (inches) Continental X King RS |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Sram X-O Levers Sram X-O Brakes |
Hubs for disc brakes | With Wheelset |
Rims manufacturer | Mavic Crossmax ST |
Spoke nipples type | Not Available |
Spoke wheel | With Wheelset |
Frame and Body Specs
Frame materials | Felt UHC Carbon Fiber |
Frame type | Carbon |
Handlebar construction | Felt Devox RXC Carbon UHC Nano |
Handlebar extender | Optional |
Handlebar stem details | Felt 3D-Forged |
Headset size | 1 1/8 (inches) - 1 1/2 (inches) Integrated |
Gearing Specifications
Bicycle chain | SRAM PC-1070 |
Bottom bracket shell width | Not Available |
Bottom bracket type | With Crankset |
Crankset parts and sizes | Sram X-O |
Gear shift levers | Sram X-O |
Rear gear set | 11 - 32 Teeth 10-speed |
Felt VIRTUE TEAM Fork System Data
Derailleur (Front) | Sram X-O |
Derailleur (Rear) | Sram X-O |
Fork material | Single Crown |
Fork type | 120 (millimeters) Travel RockShox SID 120 RLT |
Other Specs of Felt VIRTUE TEAM
Component group sets | SRAM X-O |
Pedals details | Not Available |
Rear shock absorber | 120/130 (millimeters) RockShox Monarch RT3 |
Saddle seat | Felt Mountain Design |
Seat post extension | 30.9 (millimeters) Diameter Felt Carbon Micro-adjust |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Felt provided us with the latest version of its VIRTUE TEAM bike manual
- Find All parts, tires and accessories of Felt VIRTUE TEAM Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here