Fuji OUTLAND 1.0 2011 VS Merlin CRITICAL PATH 1998 specs comparison

Fuji Outland 1.0 2011 comparison online with competitors

Fuji Outland 1.0

General Infos
Model Outland 1.0
Manufacturer Fuji
Year of production 2011
Current price Check price Here ==>   
Color choice -Black and Fuji Red
Sizes - Small
- Medium
- Large
- Extra large
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire26 X 2.25 (inches) Schwalbe Rocket Ron
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano BL-M575 Hydraulic Levers
Shimano M575 Disc Brakes
Hubs for disc brakesShimano SLX
Rims manufacturer 32-hole
Alex DP17
Spoke nipples typeNot Available
Spoke wheelNot Available

Frame and Body Specs

Frame materialsAlloy
Frame typeTIG-welded
Handlebar constructionOval M-200 Double Butted Flat Bar
Handlebar extenderOptional
Handlebar stem detailsOval M-200 RBT Alloy
Headset size1 1/2 (inches) To 1 1/8 (inches) Fuji MTB

Gearing Specifications

Bicycle chainShimano HG74
Bottom bracket shell widthNot Available
Bottom bracket typeShimano Press In Bearing System
Crankset parts and sizes 24/32/42 Teeth
Shimano SLX Hollowtech II
Gear shift leversShimano SLX RapidFire
Rear gear set 11 - 36 Teeth
10-speed

Fuji Outland 1.0 Fork System Data

Derailleur (Front) 34.9 (millimeters) Bottom Swing Top Pull
Shimano SLX
Derailleur (Rear)Shimano XT SGS Shadow
Fork materialSingle
Fork type 120 (millimeters) Travel
RockShox Recon Silver TK Solo Air

Other Specs of Fuji Outland 1.0

Component group setsShimano SLX
Pedals detailsOptional
Rear shock absorber 125 (millimeters) Travel
RockShox Monarch RT3
Saddle seatOval M-200 With CroMo Rails
Seat post extension 31.6 (millimeters) Diameter
Oval M-200


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....