Fuji OUTLAND 3.0 2011 VS Merlin CRITICAL PATH 1998 specs comparison
Fuji Outland 3.0
General InfosModel | Outland 3.0 |
Manufacturer | Fuji |
Year of production | 2011 |
Current price | Check price Here ==> |
Color choice |
-Black and Orange |
Sizes |
- Small - Medium - Large - Extra large |
Sizes |
- Small - Medium - Large - Extra large |
Wheels And Breaking System
Bike front tire | 26 X 2.25 (inches) Schwalbe Rocket Ron |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Tektro Draco Levers Tektro Draco Brakes |
Hubs for disc brakes | Fuji MTB |
Rims manufacturer | 32-hole Alex DP17 |
Spoke nipples type | Not Available |
Spoke wheel | Not Available |
Frame and Body Specs
Frame materials | Alloy |
Frame type | TIG-welded |
Handlebar construction | Oval M-200 Double Butted Flat Bar |
Handlebar extender | Optional |
Handlebar stem details | Oval M-200 RBT Alloy |
Headset size | 1 1/2 (inches) To 1 1/8 (inches) Fuji MTB |
Gearing Specifications
Bicycle chain | Shimano HG53 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano Press In Bearing System |
Crankset parts and sizes | 22/32/44 Teeth Shimano M-542 |
Gear shift levers | Shimano Deore Rapid Fire |
Rear gear set | 11 - 34 Teeth 9-speed |
Fuji Outland 3.0 Fork System Data
Derailleur (Front) | 34.9 (millimeters) Bottom Swing Top Pull Shimano Alivio |
Derailleur (Rear) | Shimano Deore SGS Direct Mount |
Fork material | Single Crown Alloy |
Fork type | 120 (millimeters) Travel RockShox Tora TK Coil |
Other Specs of Fuji Outland 3.0
Component group sets | Shimano Mix |
Pedals details | Optional |
Rear shock absorber | 125 (millimeters) Travel RockShox Bar R |
Saddle seat | Oval M-200 With CroMo Rails |
Seat post extension | 31.6 (millimeters) Diameter Oval M-200 |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Fuji provided us with the latest version of its Outland 3.0 bike manual
- Find All parts, tires and accessories of Fuji Outland 3.0 Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here