Fuji THRILL LT 2.0 2010 VS Merlin CRITICAL PATH 1998 specs comparison
Fuji Thrill LT 2.0
General InfosModel | Thrill LT 2.0 |
Manufacturer | Fuji |
Year of production | 2010 |
Current price | Check price Here ==> |
Color choice |
-Charcoal Grey |
Sizes |
- XS - S - M - L |
Sizes |
- XS - S - M - L |
Wheels And Breaking System
Bike front tire | 26 X 2.40 (inches) Continental Mountain King |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Tektro Auriga Comp Hydraulic Levers Tektro Auriga Comp With 203 (millimeters) Rotor Brakes |
Hubs for disc brakes | Rear: Formula DC-22 Disc Front: Formula DC-91 Sealed Bearing Disc 20 (millimeters) TA |
Rims manufacturer | 32-hole Alex SX-44 |
Spoke nipples type | Not Available |
Spoke wheel | 14ga. Straight Gauge Stainless Steel |
Frame and Body Specs
Frame materials | Fuji Altair 2 Aluminum |
Frame type | TIG-welded |
Handlebar construction | Double Butted Al Fuji Pro Low Rise 31.8 (millimeters) |
Handlebar extender | Optional |
Handlebar stem details | Fuji Forged Alloy |
Headset size | 1 1/8 (inches) Integrated VP-A42E |
Gearing Specifications
Bicycle chain | KMC HG-73 |
Bottom bracket shell width | Not Available |
Bottom bracket type | TruVativ Howitzer M-15 |
Crankset parts and sizes | 22/32/44 Teeth TruVativ Blaze 3.1 |
Gear shift levers | SRAM X.7 Trigger |
Rear gear set | 11 - 34 Teeth 9-speed |
Fuji Thrill LT 2.0 Fork System Data
Derailleur (Front) | Clamp On 34.9 (millimeters) SRAM X.7 |
Derailleur (Rear) | SRAM X.7 |
Fork material | Single Crown |
Fork type | 150 (millimeters) Travel SR Suntour Duro FR20 |
Other Specs of Fuji Thrill LT 2.0
Component group sets | Mountain Mix |
Pedals details | Optional |
Rear shock absorber | 150 (millimeters) Travel SR Suntour Epicon LOD |
Saddle seat | WTB Pure V Race Comp |
Seat post extension | 350 (millimeters) Fuji Pro Zero Offset AL |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Fuji provided us with the latest version of its Thrill LT 2.0 bike manual
- Find All parts, tires and accessories of Fuji Thrill LT 2.0 Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here