Gary Fisher ROSCOE I 2010 VS Merlin CRITICAL PATH 1998 specs comparison
Gary Fisher Roscoe I
General InfosModel | Roscoe I |
Manufacturer | Gary Fisher |
Year of production | 2010 |
Current price | Check price Here ==> |
Color choice |
-Matte Black and Matte White |
Sizes |
- SM (15.5) (inches) - MD (17.5) (inches) - LG (inches) - XL (inches) |
Sizes |
- SM (15.5) (inches) - MD (17.5) (inches) - LG (inches) - XL (inches) |
Wheels And Breaking System
Bike front tire | 32-hole Bontrager Duster |
Bike rear tire | 26 X 2.40 (inches) Bontrager XDX |
Bike wheel size | SRAM PG-950 |
Brakeset type | 11 - 34 Teeth 9-speed |
Hubs for disc brakes | Bontrager Rhythm Elite |
Rims manufacturer | Not Available |
Spoke nipples type | Not Available |
Spoke wheel | 140 (millimeters) Travel Fox Float RP2 With DRCV |
Frame and Body Specs
Frame materials | TIG-welded |
Frame type | Not Available |
Handlebar construction | E2 1 1/8 (inches) - 1 1/2 (inches) Semi- Integrated FSA 57 Orbits |
Handlebar extender | 690 (millimeters) X 25 (millimeters) Bontrager Low Riser OS |
Handlebar stem details | Optional |
Headset size | Crank Bros Custom Candy C |
Gearing Specifications
Bicycle chain | Not Available |
Bottom bracket shell width | 6011 Hydroformed Butted Aluminum |
Bottom bracket type | Not Available |
Crankset parts and sizes | Not Available |
Gear shift levers | Mountain Mix |
Rear gear set | Not Available |
Gary Fisher Roscoe I Fork System Data
Derailleur (Front) | SRAM X.7 Trigger |
Derailleur (Rear) | Clamp On 34.9 (millimeters) SRAM X.7 |
Fork material | 140 (millimeters) Travel Fox Float RL With 15 (millimeters) QR |
Fork type | 22/32/44 Teeth Shimano M532 |
Other Specs of Gary Fisher Roscoe I
Component group sets | Not Available |
Pedals details | SRAM X.9 |
Rear shock absorber | G2 51 (millimeters) Offset |
Saddle seat | 7d Rise Bontrager Rhythm Pro OS |
Seat post extension | Bontrager Rhythm |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Gary Fisher provided us with the latest version of its Roscoe I bike manual
- Find All parts, tires and accessories of Gary Fisher Roscoe I Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here