Gary Fisher SUGAR 292 2006 VS Merlin CRITICAL PATH 1998 specs comparison

Gary Fisher Sugar 292 2006 comparison online with competitors

Gary Fisher Sugar 292

General Infos
Model Sugar 292
Manufacturer Gary Fisher
Year of production 2006
Current price Check price Here ==>   
Color choice -Not found
Sizes - SM (16) (inches)
- MD (17.5) (inches)
- LG (inches)
- XL (inches)
Sizes - SM (16) (inches)
- MD (17.5) (inches)
- LG (inches)
- XL (inches)

Wheels And Breaking System

Bike front tire29 X 2.20 (inches) Bontrager ACX
Bike rear tireNot Available
Bike wheel size29 (inches) Wheels
Brakeset type Hayes Levers
Hayes HFX-9 XC Brakes
Hubs for disc brakesBontrager Race Lite Disc
Rims manufacturerBontrager Race Lite Disc
Spoke nipples typeNot Available
Spoke wheelNot Available

Frame and Body Specs

Frame materialsPlatinum Series ZR9000 Aluminum
Frame typeTIG-welded
Handlebar constructionBontrager Race OS Riser
Handlebar extenderOptional
Handlebar stem detailsBontrager Race X Lite OS
Headset size1 1/8 (inches) Threadless Cane Creek S-6

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG73
Bottom bracket shell widthNot Available
Bottom bracket typeISIS GigaPipe
Crankset parts and sizesBontrager Race Lite
Gear shift leversSRAM X-9 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Gary Fisher Sugar 292 Fork System Data

Derailleur (Front)Shimano Deore XT
Derailleur (Rear)SRAM X.0
Fork material Single Crown
Aluminum and magnesium
Fork type 100 (millimeters) Travel
RockShox Reba Race Dual Air 29

Other Specs of Gary Fisher Sugar 292

Component group setsMountain Mix
Pedals detailsShimano PD-M520
Rear shock absorber 4 (inches) Travel
Fox Float R
Saddle seatBontrager Race Lux
Seat post extensionBontrager Race X Lite Carbon


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....