Giant ANTHEM 2 2008 VS Merlin CRITICAL PATH 1998 specs comparison

Giant Anthem 2 2008 comparison online with competitors

Giant Anthem 2

General Infos
Model Anthem 2
Manufacturer Giant
Year of production 2008
Current price Check price Here ==>   
Color choice -Black and Brushed
Sizes - Xsmall
- small
- medium
- large. xlarge
Sizes - Xsmall
- small
- medium
- large. xlarge

Wheels And Breaking System

Bike front tire26 X 2.0 (inches) Michelin XC Dry2
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Stroker Ryde Levers
Hayes Stroker Ryde With 160 (millimeters) Rotor Brakes
Hubs for disc brakesAlloy Sealed Bearing
Rims manufacturerWTB LaserDisc XC
Spoke nipples typeNot Available
Spoke wheel 14/15ga. Butted
Stainless Steel

Frame and Body Specs

Frame materialsALUXX SL Aluminum
Frame typeTIG-welded
Handlebar constructionRace Face Ride XC Riser
Handlebar extenderOptional
Handlebar stem detailsRace Face Ride XC 31.8
Headset size1 1/8 (inches) Integrated

Gearing Specifications

Bicycle chainShimano HG-73
Bottom bracket shell widthNot Available
Bottom bracket typeRace Face XC X-Type
Crankset parts and sizes 22/32/44 Teeth
Race Face Ride XC
Gear shift leversShimano Deore Rapidfire
Rear gear set 11 - 34 Teeth
9-speed

Giant Anthem 2 Fork System Data

Derailleur (Front)Shimano Deore
Derailleur (Rear)Shimano Deore Top Normal
Fork material Single Crown
Aluminum and magnesium
Fork type 80 (millimeters) Travel
RockShox Reba SL

Other Specs of Giant Anthem 2

Component group setsShimano Deore
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Fox Float RP2
Saddle seatWTB Silverado Race
Seat post extension 30.9 (millimeters) Diameter
Race Face Ride XC


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....