Giant ATX 980 1997 VS Merlin CRITICAL PATH 1998 specs comparison

Giant ATX 980 1997 comparison online with competitors

Giant ATX 980

General Infos
Model ATX 980
Manufacturer Giant
Year of production 1997
Current price Check price Here ==>   
Color choice - black and ball burnished
-Ball burnished slate fade
Sizes - Large
- medium
- small
Sizes - Large
- medium
- small

Wheels And Breaking System

Bike front tire Rear: 26 X 1.95 (inches) Tioga Psycho TT Kevlar
Front: 26 X 1.95 (inches) Tioga Edge Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano Deore XT Levers
Shimano Deore LX V-Brake Brakes
Hubs for disc brakes Rear: Shimano Deore LX
Front: Shimano Deore LX Suspension
Rims manufacturer 32-hole
Mavic 220
Spoke nipples typeBrass Nipples
Spoke wheel 2.0 (millimeters) Straight Gauge
DT Stainless Steel

Frame and Body Specs

Frame materials Butted
Giant CU92 Aluminum
Frame typeTIG-welded
Handlebar constructionAluminum
Handlebar extenderOptional
Handlebar stem detailsDirect Connect Aluminum
Headset size1 1/8 (inches) Threadless Dia-Compe Kontak Aheadset SA-2

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Sachs SC-40
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 107 (millimeters) Spindle
Shimano BB-UN52
Crankset parts and sizes 22/32/42 Teeth
Shimano Deore LX
Gear shift leversShimano Deore LX RapidFire SL
Rear gear set 11 - 28 Teeth
8-speed

Giant ATX 980 Fork System Data

Derailleur (Front) Top-pull and clamp-on 35.0 (millimeters)
Shimano Deore LX Top-swing
Derailleur (Rear)Shimano Deore LX SGS
Fork material Triple-clamp Crown
Magnesium
Fork typeRock Shox Judy C

Other Specs of Giant ATX 980

Component group setsShimano Deore LX
Pedals detailsGiant EXT-Pro Aluminum With Clips & Straps
Rear shock absorber 3.0 (inches) Travel
RST 53
Saddle seatSelle Royal With Chromoly Rails
Seat post extension 30.8 (millimeters) Diameter
Kalloy SP-243


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....