Giant ATX TEAM 1999 VS Merlin CRITICAL PATH 1998 specs comparison
Giant ATX TEAM
General InfosModel | ATX TEAM |
Manufacturer | Giant |
Year of production | 1999 |
Current price | Check price Here ==> |
Color choice |
-Team Color |
Sizes |
- 16.5 (inches) - 18.5 (inches) - 20 (inches) |
Sizes |
- 16.5 (inches) - 18.5 (inches) - 20 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.20 (inches) Michelin Wild Gripper DH |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Formula Hydraulic Levers Formula Hydraulic Disc Brakes |
Hubs for disc brakes | Formula Disc |
Rims manufacturer | 36-hole Mavic D 521 |
Spoke nipples type | Not Available |
Spoke wheel | 2.0 (millimeters) Straight Gauge Stainless Steel |
Frame and Body Specs
Frame materials | Butted Giant CU92 Aluminum |
Frame type | TIG-welded |
Handlebar construction | Race Face Air Alloy DH Riser |
Handlebar extender | Not Available |
Handlebar stem details | Race Face SYStem |
Headset size | 1 1/8 (inches) Threadless Race Face Thermo SP |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-HG92 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano Cartridge |
Crankset parts and sizes | 44 Teeth Race Face Turbine DH |
Gear shift levers | SRAM ESP 9.0 SL Rear |
Rear gear set | 11 - 30 Teeth 8-speed |
Giant ATX TEAM Fork System Data
Derailleur (Front) | Chain Retention Device Adventure Components Chainguide |
Derailleur (Rear) | SRAM ESP 9.0 SL |
Fork material | Double Triple-clamp Crown Aluminum and magnesium |
Fork type | 6.0 (inches) Travel Rock Shox Boxxer Pro |
Other Specs of Giant ATX TEAM
Component group sets | Mountain Mix |
Pedals details | Double Sided DH Platform Clipless |
Rear shock absorber | 6.0 (inches) Travel Rock Shox Coupe Deluxe |
Saddle seat | Selle Italia Karve |
Seat post extension | 30.9 (millimeters) Diameter Aluminum Micro-adjust |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Giant provided us with the latest version of its ATX TEAM bike manual
- Find All parts, tires and accessories of Giant ATX TEAM Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here