Giant NRS AIR 2003 VS Merlin CRITICAL PATH 1998 specs comparison

Giant NRS Air 2003 comparison online with competitors

Giant NRS Air

General Infos
Model NRS Air
Manufacturer Giant
Year of production 2003
Current price Check price Here ==>   
Color choice -Team Blue
Sizes - 16.5 (inches)
- 18.5 (inches)
- 20.5 (inches)
- 22.5 (inches)
Sizes - 16.5 (inches)
- 18.5 (inches)
- 20.5 (inches)
- 22.5 (inches)

Wheels And Breaking System

Bike front tire26 X 2.00 (inches) Hutchinson Python Tubeless
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Hydraulic Levers
Shimano XTR Disc Brake Brakes
Hubs for disc brakesMavic Crossmax Disc
Rims manufacturer 24-hole
Mavic Crossmax UST Disc
Spoke nipples typeAluminum Nipples
Spoke wheel Aero
Mavic Zicral

Frame and Body Specs

Frame materialsAluxx SL Aluminum
Frame typeTIG-welded
Handlebar constructionTitec Enduro XC
Handlebar extenderOptional
Handlebar stem detailsTitec Fast Al
Headset size1 1/8 (inches) Threadless FSA Integrated

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-7701
Bottom bracket shell widthNot Available
Bottom bracket typeNot Available
Crankset parts and sizes 22/34/44 Teeth
Shimano XTR
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
9-speed

Giant NRS Air Fork System Data

Derailleur (Front) Top-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Single Crown
Aluminum and magnesium
Fork type 80 (millimeters) Travel
Rock Shox Sid XC

Other Specs of Giant NRS Air

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.75 (inches) Travel
Rock Shox Sid XC
Saddle seatWTB Rocket V-Comp Ti Rails
Seat post extension 27.2 (millimeters) Diameter
Titec X-Wing Pro


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....