Giant REIGN X1 2010 VS Merlin CRITICAL PATH 1998 specs comparison

Giant Reign X1
General InfosModel | Reign X1 |
Manufacturer | Giant |
Year of production | 2010 |
Current price | Check price Here ==> |
Color choice | -Dark Blue and Blue |
Sizes | - XS - S - M - L |
Sizes | - XS - S - M - L |
Wheels And Breaking System
Bike front tire | 26 X 2.35 Kenda Nevegal Folding |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Elixer 5 LeversAvid Elixer 5 With 185 (millimeters) Rotor Front and Avid Elixer 5 With 160 (millimeters) Rotor Rear Brakes |
Hubs for disc brakes | Rear: DT 340 With 12 (millimeters) AxleFront: DT 340 With 20 (millimeters) Thru Axle |
Rims manufacturer | 32-hole Rear: DTEX500Front: DT EX500 |
Spoke nipples type | Not Available |
Spoke wheel | 14/15ga. ButtedDT Competition Stainless Steel |
Frame and Body Specs
Frame materials | ALUXX SL Aluminum |
Frame type | Not Available |
Handlebar construction | Race Face Evolve AM Low Rise 31.8 |
Handlebar extender | Optional |
Handlebar stem details | Race Face Evolve AM 31.8 |
Headset size | 1 1/8 (inches) - 1 1/2 (inches) Integrated Integrated Cartridge |
Gearing Specifications
Bicycle chain | Shimano HG-73 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Race Face X-Type |
Crankset parts and sizes | 24/36 TeethRace Face Ride AM |
Gear shift levers | SRAM X-7 Trigger With Matchmaker |
Rear gear set | 11 - 34 Teeth9-speed |
Giant Reign X1 Fork System Data
Derailleur (Front) | Clamp-on + ShiftguideShimano SLX With Race Face Atlas Guide |
Derailleur (Rear) | SRAM X.9 |
Fork material | Not Available |
Fork type | 160 (millimeters) TravelFox 36 Vanilla R With 20 (millimeters) Thru Axle |
Other Specs of Giant Reign X1
Component group sets | Mountain Mix |
Pedals details | Giant Alloy Platform |
Rear shock absorber | 6.7 (inches) TravelFox DHX RC2 |
Saddle seat | Fi'zi:k Zeak With 7 (millimeters) K:ium Rails |
Seat post extension | 30.9 (millimeters) DiameterGiant Connect SL |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice | -Brushed |
Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR LeversShimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-holeMavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-buttedWheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) SpindleShimano BB-M950 |
Crankset parts and sizes | 24/34/46 TeethShimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters)Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp CrownAluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) TravelRock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) DiameterSyncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Giant provided us with the latest version of its Reign X1 bike manual
- Find All parts, tires and accessories of Giant Reign X1 Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here