Giant TRANCE X ADVANCED SL 0 2010 VS Merlin CRITICAL PATH 1998 specs comparison

Giant Trance X Advanced SL 0 2010 comparison online with competitors

Giant Trance X Advanced SL 0

General Infos
Model Trance X Advanced SL 0
Manufacturer Giant
Year of production 2010
Current price Check price Here ==>   
Color choice -Composite and White
Sizes - Xsmall
- small
- medium
- large
- xlarge
Sizes - Xsmall
- small
- medium
- large
- xlarge

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) Kenda Nevegal Folding
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Elixer CR Levers
Avid Elixir CR Mag With 185 (millimeters) Rotor Front and Avid Elixir CR Mag With 160 (millimeters) Rotor Rear Brakes
Hubs for disc brakesMavic Crossmax ST
Rims manufacturer 24-hole
Mavic Crossmax ST
Spoke nipples typeIntegrated M7 Aluminum
Spoke wheel Straight Pull
Mavic Zicral

Frame and Body Specs

Frame materialsGiant Advanced SL Composite
Frame typeNot Available
Handlebar constructionGiant Contact SL and R Low-rise 31.8
Handlebar extenderOptional
Handlebar stem detailsGiant Contact SL and R
Headset size1 1/8 (inches) - 1 1/2 (inches) Integrated Integrated Cartridge

Gearing Specifications

Bicycle chainShimano HG-73
Bottom bracket shell widthNot Available
Bottom bracket typeRace Face External
Crankset parts and sizes 22/32/44 Teeth
Race Face NEXT SL Carbon
Gear shift leversShimano XTR
Rear gear set 11 - 34 Teeth
9-speed

Giant Trance X Advanced SL 0 Fork System Data

Derailleur (Front) Clamp-on
Shimano XTR
Derailleur (Rear)Shimano XTR Top Normal
Fork materialNot Available
Fork type 100-140 (millimeters) Travel
Fox 32 Talas FIT RLC With 15QR Thru Axle

Other Specs of Giant Trance X Advanced SL 0

Component group setsShimano XTR Mix
Pedals detailsOptional
Rear shock absorber 5 (inches) Travel
Fox Float RP23
Saddle seatFi'zi:k Gobi XM With Braided Composite Rails
Seat post extension 30.9 (millimeters) Diameter
Giant Contact SL and R 375 (millimeters)


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....