Giant TRANCE X3 2009 VS Merlin CRITICAL PATH 1998 specs comparison

Giant Trance X3 2009 comparison online with competitors

Giant Trance X3

General Infos
Model Trance X3
Manufacturer Giant
Year of production 2009
Current price Check price Here ==>   
Color choice -Blue and Silver
Sizes - Xsmall
- small
- medium
- large
- xlarge
Sizes - Xsmall
- small
- medium
- large
- xlarge

Wheels And Breaking System

Bike front tire26 X 2.1 (inches) Kenda Nevagal
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Stroker Ryde Hydraulic Levers
Hayes Stroker Ryde With 180 (millimeters) Rotor Front and Hayes Stroker Ryde With 160 (millimeters) Rotor Rear Brakes
Hubs for disc brakes Rear: Formula Alloy
Front: Giant Tracker Sealed Disc With 15 (millimeters) Axle
Rims manufacturer 32-hole
WTB Laser Disc Trail
Spoke nipples typeNot Available
Spoke wheel 14/15ga.
Stainless

Frame and Body Specs

Frame materialsALUXX SL Aluminum
Frame typeTIG-welded
Handlebar constructionRace Face Ride XC Low Rise
Handlebar extenderOptional
Handlebar stem detailsRace Face Ride 31.8
Headset size1 1/8" c

Gearing Specifications

Bicycle chainShimano HG73
Bottom bracket shell widthNot Available
Bottom bracket typeRace Face X-Type
Crankset parts and sizes 22/32/44 Teeth
Race Face Ride XC
Gear shift leversShimano Deore RapidFire
Rear gear set 11 - 34 Teeth
9-speed

Giant Trance X3 Fork System Data

Derailleur (Front)Shimano Deore
Derailleur (Rear)Shimano SLX
Fork materialSingle
Fork type 120 (millimeters) Travel
Fox 32 F120R

Other Specs of Giant Trance X3

Component group setsMountain Mix
Pedals detailsCrank Brothers Smarty
Rear shock absorber 5 (inches) Travel
Fox Float R
Saddle seatWTB Devo Team
Seat post extension 30.9 (millimeters) Diameter
Race Face Ride XC


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....