GT FORCE 3.0 2010 VS Merlin CRITICAL PATH 1998 specs comparison

GT Force 3.0
General InfosModel | Force 3.0 |
Manufacturer | GT |
Year of production | 2010 |
Current price | Check price Here ==> |
Color choice |
- Blue -Grey |
Sizes |
- Xsmall - small - medium - large - xlarge |
Sizes |
- Xsmall - small - medium - large - xlarge |
Wheels And Breaking System
Bike front tire | Rear: 26 X 2.10 (inches) Kenda Nevegal Front: 26 X 2.30 (inches) Kenda Nevegal |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Tektro Auriga Pro Hydraulic Levers Tektro Auriga Pro With 180 (millimeters) Rotor Front and Tektro Auriga Pro With 160 (millimeters) Rotor Rear Brakes |
Hubs for disc brakes | Rear: Shimano Disc Front: GT 15 (millimeters) Through Axle With 4 Japanese Sealed Bearing |
Rims manufacturer | 32-hole WTB SX24 |
Spoke nipples type | Not Available |
Spoke wheel | 14ga. Stainless |
Frame and Body Specs
Frame materials | 6061 Monocoque c |
Frame type | TIG-welded |
Handlebar construction | GT Riser |
Handlebar extender | Optional |
Handlebar stem details | GT ATB OS |
Headset size | 1 1/8 (inches) Threadless FSA Orbit X |
Gearing Specifications
Bicycle chain | Shimano Nine Speed |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano Deore External |
Crankset parts and sizes | 22/32/44 Teeth Shimano Deore FC-M590 |
Gear shift levers | Shimano Deore |
Rear gear set | 11 - 32 Teeth 9-speed |
GT Force 3.0 Fork System Data
Derailleur (Front) | Shimano Deore |
Derailleur (Rear) | Shimano Deore SLX Shadow |
Fork material | Single |
Fork type | 140 (millimeters) Travel SR Mag 32 |
Other Specs of GT Force 3.0
Component group sets | Shimano Deore and mix |
Pedals details | Shimano PD-M520 |
Rear shock absorber | 150 (millimeters) Travel Fox Float R |
Saddle seat | WTB Pure V |
Seat post extension | 31.6 (millimeters) Diameter GT Alloy Butted 2014 |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, GT provided us with the latest version of its Force 3.0 bike manual
- Find All parts, tires and accessories of GT Force 3.0 Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here