GT FORCE CARBON EXPERT 2010 VS Merlin CRITICAL PATH 1998 specs comparison
GT Force Carbon Expert
General InfosModel | Force Carbon Expert |
Manufacturer | GT |
Year of production | 2010 |
Current price | Check price Here ==> |
Color choice |
-Grey and Carbon |
Sizes |
- Extra small - Small - Medium - Large |
Sizes |
- Extra small - Small - Medium - Large |
Wheels And Breaking System
Bike front tire | Rear: 26 X 2.10 (inches) Kenda Nevegal Front: 26 X 2.30 (inches) Kenda Nevegal |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XT Hydraulic Levers Shimano XT Disc With 180 (millimeters) Rotor Front and Shimano XT Disc With 160 (millimeters) Rotor Rear Brakes |
Hubs for disc brakes | 15 (millimeters) Thru Axle Rear: Shimano XT Centerlock Disc Front: Shimano XTCenterlock Disc |
Rims manufacturer | Mavic XM-719 Disc |
Spoke nipples type | Not Available |
Spoke wheel | 15ga. Straight Gauge DT Swiss Stainless |
Frame and Body Specs
Frame materials | Carbon Fiber |
Frame type | Monocoque |
Handlebar construction | Ritchey Pro Rize OS |
Handlebar extender | Optional |
Handlebar stem details | Thomson Elite X4 |
Headset size | 1 1/8 (inches) Integrated FSA Sealed Beaing |
Gearing Specifications
Bicycle chain | Shimano 9 Speed |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano XT Hollowtech II |
Crankset parts and sizes | 22/32/44 Teeth Shimano XT |
Gear shift levers | Shimano XT Rapid Fire |
Rear gear set | 11 - 34 Teeth 9-speed |
GT Force Carbon Expert Fork System Data
Derailleur (Front) | Shimano XT |
Derailleur (Rear) | Shimano XT Shadow |
Fork material | Single |
Fork type | 110 - 150 (millimeters) Adjustable Travel Fox 32 Talas R |
Other Specs of GT Force Carbon Expert
Component group sets | Shimano XT |
Pedals details | Not Available |
Rear shock absorber | Fox Float RP23 |
Saddle seat | Fi'zi:k Gobi XM With Mg Rails |
Seat post extension | Thomson Elite |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, GT provided us with the latest version of its Force Carbon Expert bike manual
- Find All parts, tires and accessories of GT Force Carbon Expert Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here