GT I-DRIVE 4 5.0 DISC 2006 VS Merlin CRITICAL PATH 1998 specs comparison

GT i-Drive 4 5.0 Disc
General InfosModel | i-Drive 4 5.0 Disc |
Manufacturer | GT |
Year of production | 2006 |
Current price | Check price Here ==> |
Color choice |
-F-One Blue |
Sizes |
- Xsmall - small - mediuim - large - xlarge |
Sizes |
- Xsmall - small - mediuim - large - xlarge |
Wheels And Breaking System
Bike front tire | Rear: 26 X 2.10 (inches) Tioga Blue Dragon Front: 26 X 2.10 (inches) Tioga Yellow Kirin Slo Rebound |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid FR-5 Levers Tektro Aquila Mechanical Disc Brakes |
Hubs for disc brakes | Disc Compatible Rear: MTB 9 Speed Cassette Front: MTB Disc Alloy QR |
Rims manufacturer | Black Anodized With CNC Sidew Double Wall With Single Eyelets Alex ACE-18 |
Spoke nipples type | Brass CP |
Spoke wheel | 14ga. Straight Gauge Stainless Steel |
Frame and Body Specs
Frame materials | GT I-Drive 4 6061 Heat Treated Full Suspension Frame |
Frame type | TIG-welded |
Handlebar construction | GT Butted Alum X Country Bar With 35 (millimeters) Rise And 7 Degree Bend |
Handlebar extender | Not Available |
Handlebar stem details | GT 4 Bolt Face With TIG Welded Extension And Clamp |
Headset size | Sealed Angular Contact Bearing FSA Integrated |
Gearing Specifications
Bicycle chain | Shimano CN-HG73 |
Bottom bracket shell width | Not Available |
Bottom bracket type | TruVativ Power Spline |
Crankset parts and sizes | 22/32/42 Teeth Truvativ 5D |
Gear shift levers | SRAM X7 |
Rear gear set | 12 - 32 Teeth 9-speed |
GT i-Drive 4 5.0 Disc Fork System Data
Derailleur (Front) | Shimano Deore |
Derailleur (Rear) | SRAM SX5 |
Fork material | Aluminum and magnesium |
Fork type | 100 (millimeters) Answer Trance |
Other Specs of GT i-Drive 4 5.0 Disc
Component group sets | Mountain Mix |
Pedals details | MTB Hi-impact Composite Body and Steel Cage With Cro-mo Spindle |
Rear shock absorber | 4 (inches) Travel Fox Float Air Shock 6 and 1.25 Standard Length |
Saddle seat | WTB Speed V |
Seat post extension | SL Alloy Micro Adjust |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, GT provided us with the latest version of its i-Drive 4 5.0 Disc bike manual
- Find All parts, tires and accessories of GT i-Drive 4 5.0 Disc Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here