GT IDRIVE 4 2.0 2007 VS Merlin CRITICAL PATH 1998 specs comparison

GT idrive 4 2.0 2007 comparison online with competitors

GT idrive 4 2.0

General Infos
Model idrive 4 2.0
Manufacturer GT
Year of production 2007
Current price Check price Here ==>   
Color choice -Race Silver
Sizes - Xsmall
- small
- mediuim
- large
- xlarge
Sizes - Xsmall
- small
- mediuim
- large
- xlarge

Wheels And Breaking System

Bike front tire Rear: 26 X 2.10 (inches) Kenda Nevegal
Front: 26 X 2.35 (inches) Kenda Nevegal
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type 180 (millimeters) Rotor Brakes
Shimano Hydraulic Levers
Shimano Hydraulic
Hubs for disc brakesDT Swiss Disc Centerlock
Rims manufacturerWTB Speed Disc
Spoke nipples typeDT Swiss
Spoke wheel 14ga. Straight Gauge
DT Swiss Stainless Steel

Frame and Body Specs

Frame materials6061 aluminum c
Frame typeTIG-welded
Handlebar constructionTruVativ XR 6061
Handlebar extenderOptional
Handlebar stem detailsTruVativ XR 6061
Headset size1 1/8 (inches) Integrated FSA Integrated

Gearing Specifications

Bicycle chainShimano Nine Speed
Bottom bracket shell widthNot Available
Bottom bracket typeTruVativ GXP
Crankset parts and sizes 22/32/44 Teeth
TruVativ Stylo GXP
Gear shift leversShimano Deore
Rear gear set 11 - 32 Teeth
9-speed

GT idrive 4 2.0 Fork System Data

Derailleur (Front)Shimano Deore LX
Derailleur (Rear)Shimano Deore XT High Normal
Fork material Single Crown
Aluminum and magnesium
Fork type 100 (millimeters)
RockShox Recon 327 Air

Other Specs of GT idrive 4 2.0

Component group setsMountain Mix
Pedals detailsCrank Bros Candy C
Rear shock absorber 4 (inches)
Fox Float R Shock With Rebound Adjust
Saddle seatSDG Bel Air
Seat post extensionTruVativ Micro Adjust


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....