GT LTS-4 1997 VS Merlin CRITICAL PATH 1998 specs comparison
GT LTS-4
General InfosModel | LTS-4 |
Manufacturer | GT |
Year of production | 1997 |
Current price | Check price Here ==> |
Color choice |
- black -Ball burnished |
Sizes |
- 14.5 (inches) - 16 (inches) - 18 (inches) - 20 (inches) |
Sizes |
- 14.5 (inches) - 16 (inches) - 18 (inches) - 20 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano Deore LX Levers Shimano Deore LX V-Brake Brakes |
Hubs for disc brakes | Rear: Shimano STX-RC Front: Shimano Alivio |
Rims manufacturer | 32-hole Weinmann Zac 19 |
Spoke nipples type | Brass Nipples |
Spoke wheel | 2.0 (millimeters) Straight Gauge Stainless Steel |
Frame and Body Specs
Frame materials | 7005 aluminum c |
Frame type | Welded |
Handlebar construction | Kore Lite |
Handlebar extender | Optional |
Handlebar stem details | Aluminum |
Headset size | 1 1/8 (inches) Threadless Tioga |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG31 |
Bottom bracket shell width | 73 (millimeters) English |
Bottom bracket type | Shimano |
Crankset parts and sizes | 22/32/42 Teeth SR Apex 350 |
Gear shift levers | Shimano STX-RC RapidFire SL |
Rear gear set | 11 - 30 Teeth 8-speed |
GT LTS-4 Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 31.8 (millimeters) Shimano STX Top-swing |
Derailleur (Rear) | Shimano STX-RC |
Fork material | Triple-clamp Crown Magnesium |
Fork type | Rock Shox Indy C |
Other Specs of GT LTS-4
Component group sets | Shimano STX-RC |
Pedals details | Aluminum Body With Clips & Straps Steel Cage |
Rear shock absorber | GT Elastomer |
Saddle seat | WTB SST |
Seat post extension | 26.8 (millimeters) Diameter Aluminum Micro-adjust |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Related Bike comparison

GT LTS-4 Giant MCM 990
GT LTS-4 GT Team LTS

Merlin Critical Path Scott Ransom 20

GT LTS-4 KHS XC704r
Useful links and guides ....
- To know more about this exacte bike, GT provided us with the latest version of its LTS-4 bike manual
- Find All parts, tires and accessories of GT LTS-4 Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here