GT SANCTION 2.0 2008 VS Merlin CRITICAL PATH 1998 specs comparison

GT Sanction 2.0 2008 comparison online with competitors

GT Sanction 2.0

General Infos
Model Sanction 2.0
Manufacturer GT
Year of production 2008
Current price Check price Here ==>   
Color choice -Khaki
Sizes - Small
- Medium
- Large
- Extra large
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire26 X 2.3 (inches) Kenda Nevegal
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Juicy 5 Levers
Avid Juicy 5 With 180 (millimeters) Rotor Front and Avid Juicy 5 With 160 (millimeters) Rotor Rear Brakes
Hubs for disc brakes Rear: Sealed 12 (millimeters) Thru Axle
Front: Sealed 20 (millimeters) Thru Axle
Rims manufacturer 32-hole
WTB Speed Disc
Spoke nipples typeDT Swiss
Spoke wheel 14ga.
DT Swiss Stainless Steel

Frame and Body Specs

Frame materialsGT 6061 Aluminum
Frame typeTIG-welded
Handlebar constructionRitchey Pro Rize OS
Handlebar extenderOptional
Handlebar stem detailsThomson Elite X4
Headset size1 1/8 (inches) FSA Orbit X

Gearing Specifications

Bicycle chainShimano HG-73
Bottom bracket shell widthNot Available
Bottom bracket typeNot Available
Crankset parts and sizes 22/32 Teeth
Shimano Hone With Bashguard
Gear shift leversSRAM X.7 Trigger
Rear gear set 11 - 34 Teeth
9-speed

GT Sanction 2.0 Fork System Data

Derailleur (Front)Shimano LX
Derailleur (Rear)SRAM X.9
Fork materialSingle
Fork type 160 (millimeters) Travel
Marzocchi All Mountain TST 2

Other Specs of GT Sanction 2.0

Component group setsMountain Mix
Pedals detailsCrank Brothers Acid
Rear shock absorber 6 (inches) Travel
Fox DHX Air 3.0
Saddle seatWTB Pure V Race
Seat post extensionRitchey Comp


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....