GT XCR-1000 2000 VS Merlin CRITICAL PATH 1998 specs comparison

GT XCR-1000 2000 comparison online with competitors

GT XCR-1000

General Infos
Model XCR-1000
Manufacturer GT
Year of production 2000
Current price Check price Here ==>   
Color choice - Mango and Eggplant
-Ball-Burnished and Red Anodized
Sizes - Small
- Medium
- Large
- Extra large
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire26 X 1.95 (inches) Michelin Wild Gripper Comp S
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid SD-1.9 L Levers
Avid 1D-25 Brakes
Hubs for disc brakesWTB Laser Beam Disc
Rims manufacturerWTB Laser Beam
Spoke nipples typeAlloy Nipples
Spoke wheel 1.8 (millimeters) Straight Gauge
DT Stainless Steel

Frame and Body Specs

Frame materialsEaston 6000 Elite
Frame typeTIG-welded
Handlebar constructionSyncros 2014 Riser
Handlebar extenderOptional
Handlebar stem detailsSyncros Hinged
Headset size1 1/8 (inches) Threadless Cane Creek Tufram

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG72
Bottom bracket shell widthNot Available
Bottom bracket typeShimano BB-ES70
Crankset parts and sizes 22/32/44 Teeth
Shimano Deore XT
Gear shift leversShimano Deore XT RapidFire SL
Rear gear set 11 - 34 Teeth
9-speed

GT XCR-1000 Fork System Data

Derailleur (Front)Shimano Deore XT Top-swing
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork type 3.15 (inches) Travel
Rock Shox Sid XC

Other Specs of GT XCR-1000

Component group setsMountain Mix
Pedals detailsRitchey Logic Comp V.2
Rear shock absorber 4.6 (inches) Travel
Fox Float RC
Saddle seatSDG Satellite With Jerome Foam
Seat post extensionSyncros 6061


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....