Haro WERKS XLS 2.0 2003 VS Merlin CRITICAL PATH 1998 specs comparison

Haro Werks XLS 2.0 2003 comparison online with competitors

Haro Werks XLS 2.0

General Infos
Model Werks XLS 2.0
Manufacturer Haro
Year of production 2003
Current price Check price Here ==>   
Color choice -Anthracite and X-Yellow
Sizes - 16 (inches)
- 17.5 (inches)
- 19.5 (inches)
Sizes - 16 (inches)
- 17.5 (inches)
- 19.5 (inches)

Wheels And Breaking System

Bike front tire26 X 2.00 (inches) Maxxis Larsen TT
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano Deore LX Levers
Shimano Deore Brakes
Hubs for disc brakesShimano Deore LX
Rims manufacturer 32-hole
WTB SpeedMaster
Spoke nipples typeNot Available
Spoke wheel 14/15ga. Double-butted
DT Stainless Steel

Frame and Body Specs

Frame materials Double-butted
7005 T6 Aluminum
Frame typeTIG-welded
Handlebar constructionTitec Hell Bent Flat Tracker
Handlebar extenderOptional
Handlebar stem detailsTitec Big AL
Headset size1 1/8 (inches) Threadless WTB Inner Peace C

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG73
Bottom bracket shell widthNot Available
Bottom bracket typeShimano BB-ES51
Crankset parts and sizes 22/32/44 Teeth
Shimano Deore XT
Gear shift leversShimano Deore LX RapidFire SL
Rear gear set 11 - 34 Teeth
9-speed

Haro Werks XLS 2.0 Fork System Data

Derailleur (Front)Shimano Deore XT Top-swing
Derailleur (Rear)Shimano Deore XT SGS
Fork material Single Crown
Aluminum and magnesium
Fork type 63-108 (millimeters) Travel
Rock Shox Duke SL U-Turn

Other Specs of Haro Werks XLS 2.0

Component group setsMountain Mix
Pedals detailsShimano PD-M505 SPD
Rear shock absorber 4.0 (inches) Travel
Fox Float RL
Saddle seatWTB Rocket V Laser
Seat post extension 30.9 (millimeters) Diameter
Easton EA30


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....