Ibis MOJO SL-R XT 2011 VS Merlin CRITICAL PATH 1998 specs comparison

Ibis Mojo SL-R XT
General InfosModel | Mojo SL-R XT |
Manufacturer | Ibis |
Year of production | 2011 |
Current price | Check price Here ==> |
Color choice |
- DB5 Silver - Lamborine Orange - South Beach White -Black and Blue |
Sizes |
- Small - Medium - Large - X-Large |
Sizes |
- Small - Medium - Large - X-Large |
Wheels And Breaking System
Bike front tire | Rear: 26 X 2.1 (inches) WTB Bronson Race Front: 26 X 2.3 (inches) WTB Bronson Race |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Formula RX0 Levers Formula RX0 180 (millimeters) Front and Formula RX0 160 (millimeters) Rear Brakes |
Hubs for disc brakes | Ibis |
Rims manufacturer | Stan's Arch |
Spoke nipples type | Not Available |
Spoke wheel | Not Available |
Frame and Body Specs
Frame materials | Carbon Fiber |
Frame type | Carbon Monocoque |
Handlebar construction | Easton EC70 |
Handlebar extender | Not Available |
Handlebar stem details | Ibis 3D Forged |
Headset size | 1 1/8 (inches) - 1 1/2 (inches) Cane Creek ZS44 Tapered |
Gearing Specifications
Bicycle chain | Not Available |
Bottom bracket shell width | Not Available |
Bottom bracket type | BB92 |
Crankset parts and sizes | 42/32/24t Teeth Shimano XT M780 |
Gear shift levers | Shimano XT |
Rear gear set | 11 - 36 Teeth 10-speed |
Ibis Mojo SL-R XT Fork System Data
Derailleur (Front) | Shimano XT M781D Direct Mount |
Derailleur (Rear) | Shimano XT Shadow M780 |
Fork material | Single Crown Crown Aluminum and magnesium |
Fork type | 140 (millimeters) Travel Fox Float 32 RLC 15 (millimeters) With Kashima Coat |
Other Specs of Ibis Mojo SL-R XT
Component group sets | Shimano XT Mix |
Pedals details | No Pedals |
Rear shock absorber | 140 (millimeters) Travel Fox RP23 With Kashima Coat & Adaptive Logic |
Saddle seat | WTB Rocket V |
Seat post extension | 31.6 (millimeters) Diameter Ibis 7075 Aluminum |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Ibis provided us with the latest version of its Mojo SL-R XT bike manual
- Find All parts, tires and accessories of Ibis Mojo SL-R XT Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here