Ionic ION MAX (02) 1998 VS Merlin CRITICAL PATH 1998 specs comparison

Ionic Ion Max (02) 1998 comparison online with competitors

Ionic Ion Max (02)

General Infos
Model Ion Max (02)
Manufacturer Ionic
Year of production 1998
Current price Check price Here ==>   
Color choice - Smoke and Fire Chameleon
- blue
- blue and grenn Chameleon
- blue and red Chameleon
- blue and yellow Chameleon
- custom
- gloss white
- green
- olive and red Chameleon
- orange
- red
- silver Star
- white
- yellow
-Azure blue
Sizes - Large
- medium
- small
Sizes - Large
- medium
- small

Wheels And Breaking System

Bike front tire26 X 2.25 (inches) IRC Missile
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Grip Shift ESP 9.0 Levers
Shimano Deore XT V-Brake Brakes
Hubs for disc brakes Rear: Shimano Deore XT
Front: Shimano Deore XT Suspension
Rims manufacturer 32-hole
Mavic X517
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials7005 aluminum c
Frame typeTIG-welded
Handlebar constructionTitec Enduro Hell Bent
Handlebar extenderOptional
Handlebar stem detailsTitec DH
Headset size1 1/8 (inches) Threadless Aheadset DL

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Taya TB-700
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 107 (millimeters) Spindle
Shimano BB-UN72
Crankset parts and sizes 24/34/46 Teeth
Ionic Billy DH
Gear shift leversGrip Shift ESP 9.0
Rear gear set 12 - 32 Teeth
8-speed

Ionic Ion Max (02) Fork System Data

Derailleur (Front) Top-pull and clamp-on 31.8 (millimeters)
Shimano Deore XT Top-swing
Derailleur (Rear)Grip Shift ESP 9.0
Fork material Double Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Judy XL

Other Specs of Ionic Ion Max (02)

Component group setsGrip Shift ESP 9.0/Shimano Deore XT
Pedals detailsOptional
Rear shock absorber 4.0 (inches) Travel
Rock Shox Coupe Deluxe
Saddle seatSelle Italia Flite
Seat post extension 31.6 (millimeters) Diameter
Thomson Elite


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....