Iron Horse 6 POINT 6 2008 VS Merlin CRITICAL PATH 1998 specs comparison

Iron Horse 6 Point 6 2008 comparison online with competitors

Iron Horse 6 Point 6

General Infos
Model 6 Point 6
Manufacturer Iron Horse
Year of production 2008
Current price Check price Here ==>   
Color choice -Green Satin
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.50 (inches) Maxxis Minion DH
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Juicy 7 Levers
Avid Juicy 7 With 185 (millimeters) Rotor Brakes
Hubs for disc brakes Rear: Alloy Sealed Bearing Disc With 12 (millimeters) Thru Axle
Front: Alloy Sealed Bearing Disc With 20 (millimeters) Thru Axle
Rims manufacturer 32-hole
DT Swiss E540
Spoke nipples typeNot Available
Spoke wheel 14/15/14ga.
DT Swiss Competition Stainless Steel

Frame and Body Specs

Frame materials6069 aluminum c
Frame typeTIG-welded
Handlebar constructionEaston EA70 Low-rise
Handlebar extenderOptional
Handlebar stem detailsRace Face Evolve AM OS
Headset size1 1/2 (inches) FSA Orbit Z

Gearing Specifications

Bicycle chainSRAM PG-971
Bottom bracket shell width83 (millimeters)
Bottom bracket typeFSA Mega EXO
Crankset parts and sizes 24/36 Teeth
FSA Gravity Gap MegaExo
Gear shift leversSRAM X.9 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Iron Horse 6 Point 6 Fork System Data

Derailleur (Front)Shimano Saint With E13 DRS Guide
Derailleur (Rear)SRAM X.9 Mid Cage
Fork materialSingle
Fork type 160 (millimeters) Travel
RockShox Lyrik Solo Air

Other Specs of Iron Horse 6 Point 6

Component group setsMountain Mix
Pedals detailsCrank Brothers Acid OEM
Rear shock absorber 6 (inches) Travel
Fox DHX 5.0 Air
Saddle seatWTB Pure V Race
Seat post extension 30.0 (millimeters) Diameter
Race Face Evolve XC


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....