Iron Horse 7POINT9 2006 VS Merlin CRITICAL PATH 1998 specs comparison

Iron Horse 7Point9 2006 comparison online with competitors

Iron Horse 7Point9

General Infos
Model 7Point9
Manufacturer Iron Horse
Year of production 2006
Current price Check price Here ==>   
Color choice -Gloss Pure White
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.50 (inches) WTB Timberwolf Race
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes El Camino Levers
Hayes El Camino Hd With V8 Rotor Brakes
Hubs for disc brakesDT and Swiss 440
Rims manufacturer 32-hole
DT and Swiss FR6.1D
Spoke nipples typeNot Available
Spoke wheel 14ga.
DT Swiss Stainless Steel

Frame and Body Specs

Frame materialsAluminum
Frame typeTIG-welded
Handlebar constructionRace Face Diablous Mid Rise
Handlebar extenderOptional
Handlebar stem detailsRace Face Diablous 31.8 (millimeters)
Headset size1 1/2 (inches) Threadless FSA Orbit Extreme

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
SRAM PG-991
Bottom bracket shell width83 (millimeters) English
Bottom bracket typeRace Face X-Type
Crankset parts and sizes 24/36 Teeth
Race Face Diablous X-Type
Gear shift leversSRAM X.0 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Iron Horse 7Point9 Fork System Data

Derailleur (Front)Shimano Saint With E13 DRS Guide
Derailleur (Rear)SRAM X.0 Mid Cage
Fork materialAluminum
Fork type 170 (millimeters) Travel
Marzocchi 66 SL

Other Specs of Iron Horse 7Point9

Component group setsMountain Mix
Pedals detailsCrank Brothers 5050XX Platforms
Rear shock absorber 7 (inches) Travel
Fox DHX Air
Saddle seatSDG Bel Air ST I-Beam
Seat post extensionSDG 2014 I-Beam


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....