Iron Horse WARRIOR 6.0 2008 VS Merlin CRITICAL PATH 1998 specs comparison
![Iron Horse Warrior 6.0 2008 comparison online with competitors](https://yobicycle.com/images/models/Iron-Horse-Warrior-6.0-2008-specs.jpg)
Iron Horse Warrior 6.0
General InfosModel | Warrior 6.0 |
Manufacturer | Iron Horse |
Year of production | 2008 |
Current price | Check price Here ==> |
Color choice |
-White Satin |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) - 21 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) - 21 (inches) |
Wheels And Breaking System
Bike front tire | Rear: 26 X 2.10 (inches) WTB Weirwolf Front: 26 X 2.35 (inches) WTB Weirwolf |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano M485 Levers Shimano M485 With 160 (millimeters) Rotor Brakes |
Hubs for disc brakes | Alloy Disc |
Rims manufacturer | WTB SX24 |
Spoke nipples type | Not Available |
Spoke wheel | 14ga. Stainless Steel |
Frame and Body Specs
Frame materials | Not Available |
Frame type | TIG-welded |
Handlebar construction | Easton EA30 Low Rise |
Handlebar extender | Optional |
Handlebar stem details | Easton EA30 OS |
Headset size | 1 1/8 (inches) FSA No 10 |
Gearing Specifications
Bicycle chain | KMC Z72 |
Bottom bracket shell width | 73 (millimeters) |
Bottom bracket type | 113 (millimeters) Spindle FSA Powerdrive |
Crankset parts and sizes | 22/32/42 Teeth FSA Alpha Drive |
Gear shift levers | SRAM X.5 Trigger |
Rear gear set | 11 - 34 Teeth 8-speed |
Iron Horse Warrior 6.0 Fork System Data
Derailleur (Front) | Shimano Alivio |
Derailleur (Rear) | SRAM X.5 |
Fork material | Single |
Fork type | 85 - 130 (millimeters) Adjustable Travel RockShox Tora 289 U-Turn |
Other Specs of Iron Horse Warrior 6.0
Component group sets | Mountain Mix |
Pedals details | Crank Brothers Smarty |
Rear shock absorber | 5 (inches) Travel SR Suntour RS-8 Epicon Air |
Saddle seat | WTB Pure V Sport |
Seat post extension | 30.0 (millimeters) Diameter Easton EA30 |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Iron Horse provided us with the latest version of its Warrior 6.0 bike manual
- Find All parts, tires and accessories of Iron Horse Warrior 6.0 Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here