Iron Horse YAKUZA KUMICHO TYPE R 2006 VS Merlin CRITICAL PATH 1998 specs comparison
Iron Horse Yakuza Kumicho Type R
General InfosModel | Yakuza Kumicho Type R |
Manufacturer | Iron Horse |
Year of production | 2006 |
Current price | Check price Here ==> |
Color choice |
-Pearl White |
Sizes |
- 16 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 16 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | Rear: 26 X 2.50 (inches) Maxxis Minion SRY Front: 26 X 2.70 (inches) Maxxis Minion SRY |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Hayes HFX-9-HD With BFL Lever Levers Hayes HFX-9 Hd Disc Brake With V8 Rotor Brakes |
Hubs for disc brakes | 20 (millimeters) Axle Rear: Aluminum Disc Thru-axle Front: Aluminum Disc |
Rims manufacturer | 32-hole WTB LaserDisc DH |
Spoke nipples type | Not Available |
Spoke wheel | 14ga. Straight Gauge Stainless Steel |
Frame and Body Specs
Frame materials | Aluminum |
Frame type | TIG-welded |
Handlebar construction | Easton EA50 |
Handlebar extender | Optional |
Handlebar stem details | 31.8 (millimeters) Race Face Evolve DH |
Headset size | With E-13 Reducer Cup 1 1/2 (inches) Threadless FSA Orbit IS-2 |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-HG73 |
Bottom bracket shell width | Not Available |
Bottom bracket type | FSA Mega EXO |
Crankset parts and sizes | 40 Teeth FSA Gap MegaExo |
Gear shift levers | SRAM X.7 Trigger |
Rear gear set | 12 - 26 Teeth 9-speed |
Iron Horse Yakuza Kumicho Type R Fork System Data
Derailleur (Front) | E13 SRS Chainguide |
Derailleur (Rear) | SRAM X.9 Mid Cage |
Fork material | Aluminum |
Fork type | 203 (millimeters) Travel Rock Shox Boxxer Race |
Other Specs of Iron Horse Yakuza Kumicho Type R
Component group sets | Mountain Mix |
Pedals details | Crank Brothers Mallet C Clipless |
Rear shock absorber | 8 (inches) Travel Manitou Swinger 4-Way Coil |
Saddle seat | SDG Bel Air ST I-Beam |
Seat post extension | SDG 6061 I-Beam |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Iron Horse provided us with the latest version of its Yakuza Kumicho Type R bike manual
- Find All parts, tires and accessories of Iron Horse Yakuza Kumicho Type R Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here