Iron Horse YAKUZA SOHON BUCHO 2007 VS Merlin CRITICAL PATH 1998 specs comparison
Iron Horse Yakuza Sohon Bucho
General InfosModel | Yakuza Sohon Bucho |
Manufacturer | Iron Horse |
Year of production | 2007 |
Current price | Check price Here ==> |
Color choice |
-Not found |
Sizes |
- 16 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 16 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | Rear: 26 X 2.50 (inches) Intense 909 FRO Front: 26 X 2.70 (inches) Intense 909 FRO |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Juicy 3 Levers Avid Juicy 3 With 8 (inches) Rotor Brakes |
Hubs for disc brakes | Thru Axle Alloy DH Disc |
Rims manufacturer | 36-hole WTB Dual Duty FR |
Spoke nipples type | Not Available |
Spoke wheel | 14ga. Stainless Steel |
Frame and Body Specs
Frame materials | Aluminum |
Frame type | TIG-welded |
Handlebar construction | Funn 318 |
Handlebar extender | Optional |
Handlebar stem details | MZX4 Direct Mount |
Headset size | 1.5 (inches) Integrated FSA Orbit E 1.5R |
Gearing Specifications
Bicycle chain | KMC Z72 |
Bottom bracket shell width | 83 (millimeters) English |
Bottom bracket type | FSA Mega EXO |
Crankset parts and sizes | 36 Teeth FSA Gravity Moto X MegaExo |
Gear shift levers | SRAM SX.5 Trigger |
Rear gear set | 11 - 32 Teeth 8-speed |
Iron Horse Yakuza Sohon Bucho Fork System Data
Derailleur (Front) | Chain-retention Device E Thirteen LG1 |
Derailleur (Rear) | SRAM SX.5 Mid Cage |
Fork material | Dual Crown Aluminum and magnesium |
Fork type | 185 (millimeters) Travel Marzocchi Super T RV |
Other Specs of Iron Horse Yakuza Sohon Bucho
Component group sets | Downhill Mix |
Pedals details | Wellgo Alloy Platform |
Rear shock absorber | 8 (inches) Travel Fox Vanilla R |
Saddle seat | SDG Bel Air ST I-Beam |
Seat post extension | 30.0 (millimeters) Diameter SDG 6061 I-Beam |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Iron Horse provided us with the latest version of its Yakuza Sohon Bucho bike manual
- Find All parts, tires and accessories of Iron Horse Yakuza Sohon Bucho Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here