Jamis BAM II 2010 VS Merlin CRITICAL PATH 1998 specs comparison

Jamis Bam II
General InfosModel | Bam II |
Manufacturer | Jamis |
Year of production | 2010 |
Current price | Check price Here ==> |
Color choice |
-Anodized Red |
Sizes |
- 16 (inches) - 17.5 (inches) - 19.5 (inches) |
Sizes |
- 16 (inches) - 17.5 (inches) - 19.5 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.5 (inches) Maxxis Minion DH |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano Saint Hydraulic Servo-Wave Levers Shimano Saint With 203 (millimeters) Rotor Brakes |
Hubs for disc brakes | Rear: Syncros FR 150 (millimeters) X 12 (millimeters) Thru-Axle Front: Syncros FR 20 (millimeters) Thru-Axle |
Rims manufacturer | 32-hole Mavic EX823 UST |
Spoke nipples type | Nickel-Plated Brass |
Spoke wheel | 14ga. DT Swiss Champion Stainless Steel |
Frame and Body Specs
Frame materials | 7005 aluminum c |
Frame type | TIG-welded |
Handlebar construction | Syncros FR 20 Riser |
Handlebar extender | Optional |
Handlebar stem details | E.13 Ali Direct Mount |
Headset size | 1 1/2 (inches) To 1 1/8 (inches) Reducer Syncros FBI Reducer |
Gearing Specifications
Bicycle chain | SRAM PC-971 With Power Link |
Bottom bracket shell width | 83 (millimeters) |
Bottom bracket type | Shimano Integrated |
Crankset parts and sizes | 36 Teeth Shimano Saint With E*13 LG1 Chain Guide |
Gear shift levers | Shimano Saint RapidFire Plus SL |
Rear gear set | 11 - 28 Teeth 9-speed |
Jamis Bam II Fork System Data
Derailleur (Front) | Not Available |
Derailleur (Rear) | Shimano Saint Shadow SS |
Fork material | Dual |
Fork type | 203 (millimeters) Travel Fox 40 RC2 Ti Coil |
Other Specs of Jamis Bam II
Component group sets | Shimano Saint |
Pedals details | E*13 Enzo 8 Flat Alloy |
Rear shock absorber | 200 (millimeters) Travel Fox DHX RC4 |
Saddle seat | WTB Devo Team |
Seat post extension | 31.6 (millimeters) Diameter Syncros FR |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Jamis provided us with the latest version of its Bam II bike manual
- Find All parts, tires and accessories of Jamis Bam II Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here