Jamis DAKAR COMP 2002 VS Merlin CRITICAL PATH 1998 specs comparison

Jamis Dakar Comp 2002 comparison online with competitors

Jamis Dakar Comp

General Infos
Model Dakar Comp
Manufacturer Jamis
Year of production 2002
Current price Check price Here ==>   
Color choice - Matte Black
-Chrome Black
Sizes - 13 (inches)
- 15 (inches)
- 17 (inches)
- 19 (inches)
- 21 (inches)
Sizes - 13 (inches)
- 15 (inches)
- 17 (inches)
- 19 (inches)
- 21 (inches)

Wheels And Breaking System

Bike front tire26 X 2.00 (inches) Hutchinson Scorpion
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Levers
Hayes HFX Magnesium Hydraulic Brakes
Hubs for disc brakesShimano Deore Disc
Rims manufacturer 32-hole
Mavic X223 Disc
Spoke nipples typeBrass Nipples
Spoke wheel 14ga. Straight Gauge
WTB Stainless Steel

Frame and Body Specs

Frame materials Double-butted With Replaceable Derailleur Hanger
7005 Aluminum
Frame typeTIG-welded
Handlebar constructionManitou ProTaper OE
Handlebar extenderOptional
Handlebar stem detailsRitchey Pro
Headset size1 1/8 (inches) Integrated Cane Creek ZS-2

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG72
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 113 (millimeters) Spindle
Shimano BB-ES70
Crankset parts and sizes 22/32/44 Teeth
Shimano Deore LX
Gear shift leversShimano Deore RapidFire SL
Rear gear set 11 - 32 Teeth
9-speed

Jamis Dakar Comp Fork System Data

Derailleur (Front) Top-pull and clamp-on 31.8 (millimeters)
Shimano Deore LX
Derailleur (Rear)Shimano Deore XT GS
Fork material Single Triple-clamp Crown
Aluminum
Fork type 4.0 (inches) Travel
Answer Manitou Black Comp 8100

Other Specs of Jamis Dakar Comp

Component group setsMountain Mix
Pedals detailsWellgo WPD-823 Clipless
Rear shock absorber 4.0 (inches) Travel
Fox Vanilla R
Saddle seatKoski Contour Team
Seat post extension 27.2 (millimeters) Diameter
Thomson Elite


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....